Storage (Duration 1h)

3 unique locations (19 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Sub Station Percival, Lane Runcorn Cheshire, WA7 4DS (5 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire, CH65 1AL (7 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU Cadishead Power Station CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (7 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 3 locations