Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

3 unique locations (20 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire, CH65 1AL (7 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU Cadishead Power Station CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (7 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT D LIMITED New Build Generating CMU UKER31 UKER33 +2 more WN1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 3 locations