Storage (Duration 1h)

4 unique locations (15 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility

Storage Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED New Build Generating CMU South Redhouse South Redhouse +1 more KY1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Heatherywood Road, Kirkcaldy, KY1 3NW (4 components)

1hr Duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU SRHA05 KY1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.27 MW
Heatherywood Road, Kirkcaldy KY1 3NW (4 components)
• 1hr Duration battery storage project.
• 1hr duration battery storage project.
Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU South Redhouse KY1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.27 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (2 components)
• 1hr duration lithium-ion battery energy storage system.
• Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been declared as being 10.000MW instead of the distribution connection agreement capacity of 16.000MW for the purposes of calculating extended performance. The connection capacity of 10.000MW is a conservative estimate for the available battery capacity at the end of the CM delivery year 2028/29, using engineering judgement to take into account projected battery degradation and system performance at that time.
Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU BRLR Redhouse KY1
Active • 2029-30 (T-4), 2028-29 (T-4)
2.09 MW
Loading map...