Storage (Duration 1h)

49 unique locations (158 components) - Page 1 of 2

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (5 components)

10MW battery energy storage facility at Upton Lane, Rownhams (3)

Storage Battery Storage Storage (Duration 1h) GBSL NURSLING LIMITED New Build Generating CMU GBSL Nursling GBSL Nursling +1 more Conditional SO16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Storage Storage (Duration 1h) Reliagen Electric Ltd New Build Generating CMU Staines Battery Storage Facility Staines Battery Storage Facility Conditional TW18
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry S64
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (3)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU KPB001 KPB001 PL6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

Storage Storage (Duration 1h) E.ON UK CHP LIMITED New Build Generating CMU Stevens Croft Battery Stevens Croft Battery Conditional DG11
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (3 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Slamseys Energy Centre +1 more CM77
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Storage (Duration 1h) ERSKINE ENERGY STORAGE LIMITED New Build Generating CMU Erskine Erskine Energy Storage Rejected PA7
Active • 2025-26 (T-4), 2022-23 (T-4)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 NG2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Storage (Duration 1h) Voltalia UK Ltd New Build Generating CMU Severn Road Severn Road 5 +2 more Not Prequalified BS10
Inactive • 2023-24 (T-4), 2022-23 (T-4)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• A Battery Energy Storage System (2)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Storage (Duration 1h) ARL 016 LIMITED New Build Generating CMU Eynsford Close Not Prequalified BR5
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Perseverance Road, Hereford, UK, HR4 9SE (1 component)

A 8MW New Build Battery Storage Site

Storage (Duration 1h) Noriker Perseverance Ltd New Build Generating CMU Noriker Perseverance 1 Conditional HR4
Inactive • 2022-23 (T-4)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region. (2)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Storage Storage (Duration 1h) Ecotricity Generation Limited New Build Generating CMU Alveston Battery Storage Alveston Battery Storage Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 1h) PEAK GEN POWER 26 LIMITED New Build Generating CMU Peak Gen Power 26 Peak Gen Power 26 +1 more Conditional RG31
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW. (2)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Halesworth Battery Storage Facility Halesworth Battery Storage Facility +1 more Not Prequalified IP19
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Netherlands Way, Kiln Lane Industrial Estate, Starlingborough, UK, DN41 8DF (2 components)
• A 20MW New Build Battery Storage Site
• A 40MW New Build Battery Storage Site
Storage (Duration 1h) HC ESS8 Limited New Build Generating CMU Immingham 1 Immingham 2 Conditional DN41
Inactive • 2022-23 (T-4)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)

Storage Storage (Duration 1h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU LOWDY1 LOWDY1 Not Prequalified CA11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Lascar Works, Tanpits Road, Bury BL9 5BY (1 component)

20.000 MW of battery storage located at Lascar Works

Storage (Duration 1h) LASCAR BATTERY STORAGE LIMITED New Build Generating CMU Lascar BL9
Inactive • 2022-23 (T-4)
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Storage (Duration 1h) DRUMCROSS ENERGY STORAGE LIMITED New Build Generating CMU Drumcross Drumcross Energy Storage EH48
Active • 2025-26 (T-4), 2022-23 (T-1) ...
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component)

Frequency response 60 minute Battery Storage

Storage (Duration 1h) ADD RENEWABLES NO.3 LIMITED New Build Generating CMU Hunn1 Conditional S70
Inactive • 2022-23 (T-4)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

Storage Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Ipsley Battery Storage Facility Conditional B98
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

Storage Storage (Duration 1h) SOUTH EAST GRID STORAGE TWO LTD New Build Generating CMU Rayleigh Battery Storage Facility Rayleigh Battery Storage Facility Rejected SS6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines and will have export capacity of 20.000MW.
Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas) NORTH EAST GRID STORAGE TWO LTD New Build Generating CMU Bransholme Battery Storage Facility Bransholme Facility Conditional HU7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land south of Westerton Road, Keith Moray, Scotland AB55 5NR (1 component)

Battery Storage

Storage (Duration 1h) Keith Storage Solutions Limited New Build Generating CMU KSSL-1hr NBM Conditional AB55
Inactive • 2022-23 (T-4)
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Storage (Duration 1h) ENERGY STORE 4 LTD New Build Generating CMU Hull Energy Centre Conditional HU11
Inactive • 2022-23 (T-4)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)

Storage Storage (Duration 1h) SOUTH WEST GRID STORAGE TWO LTD New Build Generating CMU Iron Acton Battery Storage Facility Iron Acton Battery Storage Facility Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 25 locations