Storage (Duration 1h)

41 unique locations (216 components) - Page 1 of 2

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (29 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Asfordby 1 Power Station Asfordby 1 Power Station +12 more LE14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Storage (Duration 1h) HC ESS6 LIMITED New Build Generating CMU Wickham Market 3 Wickham Market 3 +1 more IP13
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) BRK 001 Limited New Build Generating CMU The Common The Common A +2 more Not Prequalified SN16
Active • 2024-25 (T-4), 2023-24 (T-4) ...
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility (3)

Storage Storage (Duration 1h) IRE 001 LIMITED New Build Generating CMU KEYDT1 2MW storage KEYDT2 18MW storage +1 more PL2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Storage Storage (Duration 1h) SpectrumReserve6 Ltd. New Build Generating CMU Spitfire Way Battery Storage Facility Spitfire Way Battery Storage Facility Not Prequalified FK3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Storage (Duration 1h) HC ESS4 LIMITED New Build Generating CMU Longridge 3 Longridge 3 +1 more PR2
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Potmans Lane, Battle, TN33 9BL (6 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) BRK 002 Limited New Build Generating CMU Potmans Lane A Potmans Lane B +1 more Not Prequalified TN33
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• A Battery Energy Storage System (2)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Storage (Duration 1h) ARL 016 LIMITED New Build Generating CMU Eynsford Close Not Prequalified BR5
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW. (2)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Halesworth Battery Storage Facility Halesworth Battery Storage Facility +1 more Not Prequalified IP19
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (3)

Storage Storage (Duration 1h) GHEB2 C1 Limited New Build Generating CMU Meadowcroft Farm Meadowcroft Farm +1 more Not Prequalified GL54
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery storage (2)
• Battery strorage unit
Storage (Duration 1h) CENTRICA BUSINESS SOLUTIONS UK LIMITED Existing Generating CMU JPSBDV Rejected SL4
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)

Storage Storage (Duration 1h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU LOWDY1 LOWDY1 Not Prequalified CA11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm. (2)

Storage (Duration 1h) ENERGY DEMAND & RESPONSE LIMITED New Build Generating CMU Leighton Hall BESS Not Prequalified CW1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (2 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) GRIDRESERVE LTD New Build Generating CMU Byers Brae Battery Storage Facility Byers Brae Battery Storage Facility +1 more EH54
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land south of Halesfield 13, Telford, TF7 4PL (2 components)

5MW of Lithium Ion battery storage and power conversion systems. (2)

Storage (Duration 1h) HALESFIELD ENERGY CENTER LTD New Build Generating CMU Not Prequalified TF7
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components)

A 25MW New Build Battery Storage site (2)

Storage (Duration 1h) Noriker Bond Ltd New Build Generating CMU Blandford 1 BH16
Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage 017 +1 more M33
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)

Storage Storage (Duration 1h) SpectrumReserve2 Ltd New Build Generating CMU Dalmarnock Battery Storage Facility Dalmarnock Battery Storage Facility G73
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land off Carseview Road, Forfar, DD8 3BS (7 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure. (2)
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components)

20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road (2)

Storage (Duration 1h) PINSTONE ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified SL9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW. (2)
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Tollgate Battery Storage Facility Tollgate Battery Storage Facility +1 more Not Prequalified AL4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (2)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Solar Photovoltaic Storage (Duration 1h) PORTH WEN SOLAR LIMITED New Build Generating CMU North Anglesey Battery Storage Project North Anglesey Battery Storage Project +5 more Not Prequalified LL66
Active • 2024-25 (T-4), 2023-24 (T-4) ...
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components)

Gas Peaking Reciprocating Engine (3)

Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (2)

Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Rejected FY5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 25 locations