Storage (Duration 1h)

21 unique locations (102 components)

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components)
• A 50MW New Build Battery Storage site (2)
• Existing 50MW Battery Storage site
Storage (Duration 1h) HC ESS6 LIMITED New Build Generating CMU Wickham Market 3 Wickham Market 3 +1 more IP13
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component)

Storage facility

Storage (Duration 1h) IRE 001 Limited New Build Generating CMU Ernesettle Lane PL5
Inactive • 2022-23 (T-1)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Braintree Electric Forecourt +2 more CM77
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (4 components)

1.500MW Battery Energy Storage System (3)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT001 GL2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Redscar Business Park, Longridge Road, Preston, UK, PR2 5NQ (6 components)
• A 34MW New Build Battery Storage Site.
• A 49MW New Build Battery Storage Site.
• A 49MW existing Battery Storage Site.
Storage (Duration 1h) HC ESS4 LIMITED New Build Generating CMU Longridge 3 Longridge 3 +1 more PR2
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Plot B at Severn Road Avonmouth BS10 7SE (4 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Storage (Duration 1h) Hallen Energy Ltd Existing Generating CMU New Build Generating CMU NB_308 NB_308 BS10
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.50 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more Rejected CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Storage (Duration 1h) DRUMCROSS ENERGY STORAGE LIMITED New Build Generating CMU Drumcross Drumcross Energy Storage EH48
Active • 2025-26 (T-4), 2022-23 (T-1) ...
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) GRIDRESERVE LTD New Build Generating CMU Byers Brae Battery Storage Facility Byers Brae Battery Storage Facility +1 more EH54
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land off Dunsinane Avenue, Dunsinmore Industrial Estate, Dundee, Scotland, DD2 3QF (3 components)
• 49MW Lithium-ion Energy Storage System (2)
• 49.9MW Lithium-ion Energy Storage System
Storage (Duration 1h) SUSI EELPOWER DUNSINANE LIMITED New Build Generating CMU LYND21 LYND21 DD2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.28 MW
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (5 components)
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services. (2)
• Battery Energy Storage System located at Minety
Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU MBSS01 MBSS01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (5 components)
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire (2)
• 49.900MW Battery Energy Storage System
Storage (Duration 1h) LOWER MINETY ENERGY LIMITED New Build Generating CMU LMES01 LMES01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Heatherywood Road, Kirkcaldy KY1 3NW (2 components)

1hr duration battery storage project. (2)

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU South Redhouse KY1
Active • 2025-26 (T-4), 2022-23 (T-1)
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (12 components)
• A new Build Generating Storage CMU (2)
• Existing Generating Storage CMU
Storage (Duration 1h) GH ESS7 LIMITED New Build Generating CMU Thurcroft 1 Thurcroft 1 +4 more Not Prequalified S66
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)

Storage (Duration 1h) LIGHTSOURCE SPV 115 LIMITED New Build Generating CMU Burwell Storage Facility CB25
Active • 2025-26 (T-4), 2022-23 (T-1)
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System (3)

Storage (Duration 1h) ARL 001 LIMITED New Build Generating CMU Gipsy Lane Gipsy Lane +1 more OL11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.35 MW
Boscar Grange Farm York YO61 3NQ (4 components)

Battery Energy Storage system operating alongside solar farm (3)

Storage (Duration 1h) WARRINGTON RENEWABLES (YORK) LTD Existing Generating CMU BOSCAR GRANGE Rejected YO61
Active • 2025-26 (T-1), 2023-24 (T-1) ...
6.19 MW
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
• Battery Energy storage linked to solar farm (2)
• Solar farm
Solar Photovoltaic Storage (Duration 1h) WARRINGTON RENEWABLES (HULL) LIMITED New Build Generating CMU BILTON FARM BILTON FARM HU11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.45 MW
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Whitelee Battery Whitelee Battery +1 more G75
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Loading map...
Showing 21 locations