Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 0.5h)

6 unique locations (220 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (28 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3608.42 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (14 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2029-30 (T-4), 2026-27 (T-4) ...
10.10 MW
Land Adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (12 components)
• New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
Active • 2029-30 (T-4), 2028-29 (T-4) ...
5.85 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Loading map...
Showing 6 locations