Storage (Duration 0.5h)

18 unique locations (88 components)

Active MW: 7408.38 MW
Inactive MW: 379.03 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7351.35 MW
Thames Water Sewage Treatment Works, Ducklington Lane, Witney, OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
6.56 MW
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA BS7
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
16.49 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (8 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
Storage Storage (Duration 2h) Storage (Duration 0.5h) NEVENDON ENERGY STORAGE LTD New Build Generating CMU Nevendon Battery Storage Nevendon Battery Storage +2 more SS14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.46 MW
Stanstead Abbots, Ware, Hertfordshire, SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
25.39 MW
Roundponds Farm, Shurnold, Melksham, Wiltshire, SN12 8DF (3 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
9.44 MW
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION

Storage Storage (Duration 0.5h) ROSSIDE ENERGY LIMITED New Build Generating CMU ROS ROS Conditional LA12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
3.08 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
8.75 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
3.54 MW
Land at Lookabootye, Broxburn, West Lothian, EH52 5PD (4 components)
• New build battery
• Operational battery
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
6.90 MW
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
55.99 MW
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 1h) Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Hawthorne Road Hawthorne Road New Build Generating CMU +1 more Conditional L20
Active • 2024-25 (T-4), 2022-23 (T-4) ...
11.51 MW
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Gateway Crescent New Build Generating CMU Gateway Crescent New Build Generating CMU Conditional OL9
Inactive • 2022-23 (T-4), 2021-22 (T-4)
6.56 MW
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage Storage (Duration 0.5h) ORSTED ESS MERSEY LIMITED New Build Generating CMU Carnegie Road New Build Generating CMU Carnegie Road New Build Generating CMU L13
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.82 MW
Amersham Road, Denham, Buckinghamshire, SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.38 MW
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA DA1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
16.49 MW
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready …

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Arkwright Road New Build Generating CMU Arkwright Road New Build Generating CMU Conditional WA7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
6.56 MW
Loading map...
Showing 18 locations