Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

6 unique locations (22 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Substation at Saltend Lane, Preston, East Riding of Yorkshire, HU12 8EY (5 components)
• Bio-liquid fuelled distribution connected generation station
• Gas fuelled distribution connected generation station
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
74.79 MW
Land at Warne Road, Western-super-Mare, BS23 3TP (3 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Land at the corner of Hull Road and Salt End Lane, HU12 8PP (4 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
141.33 MW
Land at Kilbuck Lane, Haydock Cross Industrial Estate, St. Helens, WA11 9SR (3 components)

A new build gas fuelled generating plant at Haydock Cross Industrial Estate, WA11 9SR

Reciprocating engines VP FLEXGEN LIMITED New Build Generating CMU KILBUCK LANE KILBUCK LANE WA11
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
J3 Business Park, Balby Carr Bank, Balby, Doncaster, DN4 8DE (3 components)

A 20MW New Build gas fuelled generating station.

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
56.95 MW
Budds Plantation, Paices Hill, Aldermaston, RG7 4PJ (4 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
56.99 MW
Loading map...
Showing 6 locations