Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

83 unique locations (404 components) - Page 1 of 4

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (1 component)

Gas reciprocating engines.

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF10
Active • 2024-25 (T-1)
1.22 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components) Geocoding Needed
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-4) ...
82.06 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components) Geocoding Needed

A 6.9MW gas fuelled generating station.

Reciprocating engines GORING POWER LTD New Build Generating CMU GORING GORING +1 more RG8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.53 MW
Tweedale Way, Oldham OL9 8EH (4 components) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Scholes Power OL9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.81 MW
3.14 MW
Toray 2, Toray Textiles ImportExport, Crown Farm Way, Mansfield, Nottingham, NG19 0FN (4 components) Geocoding Needed
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.23 MW
1.04 MW
Toray 1, Toray Textiles ImportExport, Crown Farm Way, Mansfield, Nottingham, NG19 0FN (6 components) Geocoding Needed
• Gas fired generating unit
• Gas generating unit(s)
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.59 MW
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FN (2 components)
• Gas fired generating unit
• Gas reciprocating engines
Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU A11703 Torays NG19
Active • 2024-25 (T-1), 2019-20 (T-1)
Tickhill Road, Rotherham, South Yorkshire, S66 7QW (7 components) Geocoding Needed
• Gas fired generating unit(s)
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.57 MW
Tickhill Road Rotherham South Yorkshire S66 7QW (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Maltby S66
Active • 2024-25 (T-1)
1.98 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components) Geocoding Needed
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
26.37 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (4 components) Geocoding Needed

Brigg Gas Peaker

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU 8RESAK 8RESAK DN20
Active • 2026-27 (T-4), 2025-26 (T-4) ...
158.29 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (1 component)

New build gas reciprocating multi-engine generating plant

Reciprocating engines VPI IMMINGHAM ENERGY PARK A LIMITED New Build Generating CMU VPI Energy Park A DN40
Active • 2024-25 (T-1)
47.08 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (9 components) Geocoding Needed
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (ROCHESTER) LIMITED New Build Generating CMU Rochester Rochester +1 more ME2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
25.02 MW
Rhodesia Power Limited, Highgrounds Industrial Estate, Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components) Geocoding Needed

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
37.82 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (3 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Reciprocating engines RHODESIA POWER LIMITED New Build Generating CMU Rhodesia Power Limited S80
Active • 2025-26 (T-1), 2024-25 (T-1) ...
28.30 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components) Geocoding Needed
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (6 components) Geocoding Needed
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
45.95 MW
Radstone Rd, Radstone, Brackley NN13 5PY (5 components) Geocoding Needed
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
18.88 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components) Geocoding Needed
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) PYEBRIDGE POWER LTD Existing Generating CMU Gas Generation Pye Bridge Gas Generation Pye Bridge +4 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
45.90 MW
Prowse's Lane, Axbridge, BS26 2HP. (3 components) Geocoding Needed

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Axbridge Axbridge +1 more BS26
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.66 MW
Prince of Wales Energy Park, Land off Skinner Lane, Pontefract, WF8 1HG (2 components) Geocoding Needed

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
3.38 MW
Prince of Wales Energy Park Land off Skinner Lane Pontefract WF8 1HG (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio WF8
Active • 2024-25 (T-1)
0.47 MW
Loading map...
Showing 25 locations