Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

115 unique locations (549 components) - Page 1 of 5

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Cranleigh Cranleigh Not Prequalified GU6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.15 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-4) ...
82.06 MW
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (3 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Postley Power MK42
Active • 2025-26 (T-4), 2023-24 (T-1) ...
9.22 MW
Unit 7, Cambridgeshire, Business Park, Angel Drove, Ely CB7 4DT (4 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.28 MW
Unit 7, Cambridgeshire Business Park, Angel Drove, Ely CB7 4DT (1 component)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Angel Drove Power Not Prequalified CB7
Inactive • 2023-24 (T-1)
4.83 MW
Unit 1 Lanes Farm, Marlborough Road, Royal Wootton Bassett, Swindon, SN4 7SA (9 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
31.89 MW
Unit 1 Lanes Farm Marlborough Road Royal Wootton Bassett Swindon SN4 7SA (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD (WOOTTON) LIMITED New Build Generating CMU Wootton Wootton +3 more SN4
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
6.19 MW
Tweedale Way, Oldham OL9 8EH (4 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Scholes Power OL9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.81 MW
Titanium Road, Cocket, Swansea, SA5 4NH (6 components)
• New build site with gas reciprocating engines to replace diesel plant
• STOR diesel engines that will operate environmentally with mixed fuel
Reciprocating engines GFI73 LTD Refurbishing Generating CMU Swansea Swansea SA5
Active • 2026-27 (T-4), 2025-26 (T-4) ...
37.58 MW
Sparrowhawk Road, Halesworth, East Suffolk, IP19 8QW (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (HALESWORTH) LIMITED New Build Generating CMU Halesworth Halesworth +1 more IP19
Active • 2024-25 (T-4), 2023-24 (T-1) ...
20.58 MW
SOUTH CLOSE, ROSYTON, SG8 5UH (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.23 MW
SOUTH CLOSE ROSYTON SG8 5UH (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Orchard Power Orchard Power +1 more SG8
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.74 MW
Salford Road, Over Holton, Bolton, Lancashire BL5 1BW (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines SALFORD POWER LIMITED New Build Generating CMU Salford Salford +2 more BL5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.10 MW
Rhodesia Power Limited, Highgrounds Industrial Estate, Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
37.82 MW
Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (3 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial … (3)

Reciprocating engines RHODESIA POWER LIMITED New Build Generating CMU Rhodesia Power Limited S80
Active • 2025-26 (T-1), 2024-25 (T-1) ...
28.30 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) PYEBRIDGE POWER LTD Existing Generating CMU Gas Generation Pye Bridge Gas Generation Pye Bridge +4 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
45.90 MW
Prowse's Lane, Axbridge, BS26 2HP. (3 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Axbridge Axbridge +1 more BS26
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.66 MW
Port Talbot, Port Talbot Works, SA13 2NG (6 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
74.11 MW
Plot D2, Kingdom Avenue, Westbury, Wiltshire, South West England, England, BA13 4EW (4 components)

A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.

Reciprocating engines GRIDSOURCE (KINGDOM AVENUE) LIMITED New Build Generating CMU Kingdom Avenue Kingdom Avenue Not Prequalified BA13
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.64 MW
Pandora Business Park Greengate, Middleton, Manchester, M24 1RU (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
31.71 MW
Pandora Business Park Greengate Middleton Manchester M24 1RU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD (MIDDLETON JUNCTION) LIMITED New Build Generating CMU Middleton Junction Middleton Junction +2 more M24
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
8.19 MW
Old Littleton Road, Chertsey, TW17 9NU (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chertsey Not Prequalified TW17
Active • 2026-27 (T-4), 2023-24 (T-1)
34.26 MW
Old Church Lane, Billericay, CM13 1UP (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
28.59 MW
Old Church Lane Billericay CM13 1UP (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD (BILLERICAY) LIMITED New Build Generating CMU Billericay Billericay +1 more CM13
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
9.52 MW
Loading map...
Showing 25 locations