Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

50 unique locations (190 components) - Page 1 of 2

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Unit J1 Aven Industrial Park, Tickhill Road, Maltby, Rotherham, S66 7QR (3 components) Geocoding Needed

Gas fired generating sets

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
14.82 MW
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN. (4 components) Geocoding Needed
• A New Build 5MW Gas Fuelled Generating Station.
• A New Build 8MW Gas Fuelled Generating Station.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
24.67 MW
Snape Lane, Doncaster, DN11 8RU (2 components) Geocoding Needed
• A 7MW gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
Inactive • 2019-20 (T-1), 2018-19 (T-1)
13.30 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components) Geocoding Needed
• A Prospective New Build Gas reciprocating energy reserve facility
• Gas reciprocating energy reserve facility
Active • 2024-25 (T-4), 2023-24 (T-4) ...
230.52 MW
Rounponds Energy Limited, Roundponds Farm, Melksham, Wiltshire SN12 8DF (4 components) Geocoding Needed
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
37.83 MW
Rounponds Energy Limited Roundponds Farm, Melksham, Wiltshire SN12 8DF (2 components)
• New build diesel or gas dual fuel generating station
• New build reciprocating generating station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Radstone Rd, Radstone, Brackley NN13 5PY (5 components) Geocoding Needed
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
18.88 MW
Plymouth Energy Park (Former Toshiba Site), Ernsettle Lane, Plymouth. PL5 2EY, Note: OS ref SX446601, postcode PL5 2EY, and postcode PL5 2TT and PL5 2TS all relate to the same site. Postcode is ambiguous as site has not been allocated a postcode by the post office at the current time). (5 components) Geocoding Needed
• The site consists of 48 diesel generators.
• This is an additional CMU component in addition to the existing 20MW diesel plant on the site. This CMU has been created on the basis of a recent bid to convert part of this plant to provide EFR. If that bid is successful then this CMU will be used to apply to provide CM services from the upgraded site. If the EFR bid is unsuccessful this CMU application may be withdrawn and the existing CMU used. The CMU will be based in a diesel/battery hybrid configuration providing 10MW of generation. The plant will be produced through an upgrade of the existing diesel site.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
67.79 MW
Plymouth Energy Park (Former Toshiba Site), Ernsettle Lane, Plymouth. PL5 2EY Note: OS ref SX446601, postcode PL5 2EY, and postcode PL5 2TT and PL5 2TS all relate to the same site. Postcode is ambiguous as site has not been allocated a postcode by the (4 components)
• The site consists of 48 diesel generators. (2)
• This is an additional CMU component in addition to the existing 20MW diesel plant on the site. This CMU has been created on the basis of a recent bid to convert part of this plant to provide EFR. If that bid is successful then this CMU will be used to apply to provide CM services from the upgraded site. If the EFR bid is unsuccessful this CMU application may be withdrawn and the existing CMU used. The CMU will be based in a diesel/battery hybrid configuration providing 10MW of generation. The plant will be produced through an upgrade of the existing diesel site.
Reciprocating engines Keystone Power Limited Existing Generating CMU Keystone EFR Plymouth +1 more PL5
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Part Of Plots 15 And 16 Unit Rw 1 Bankwood Lane New Rossington Doncaster DN11 0PS (4 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
7.60 MW
Old Mill Industrial Estate, Mansfield, NG19 9BG (3 components) Geocoding Needed
• 1 x MWM TCG 2016V
• Gas fired generating unit
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.97 MW
New Droppingwell Road, Rotherham, S61 2DL (10 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
45.63 MW
16.47 MW
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (4 components) Geocoding Needed
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Storage Reciprocating engines SPECTRUMRESERVE5 LTD New Build Generating CMU Netherton Battery Storage Facility Netherton Gas Generation ML2
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
30.41 MW
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (3 components) Geocoding Needed

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
37.99 MW
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Seal Sands Road, Seal Sands, Middlesbrough, TS2 1UB (6 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
10.92 MW
Land at Ernest Nunn Road, Stowmarket IP14 2AH (2 components) Geocoding Needed

CMU is a new 20MW facility, metered on the distrbution boundary using a COP2 meter with no auxilliary load on site.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
37.39 MW
Land at Burn Park Farm, Cottingham, HU16 5SB (4 components) Geocoding Needed
• Battery storage plant
• Gas Peaking Reciprocating engines
• Gas peaking reciprocating engine
Reciprocating engines OCGT and Reciprocating Engines NORTON STORAGE LIMITED New Build Generating CMU Creyke Beck Power 002 Creyke Beck Power 025 +2 more HU16
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
189.30 MW
Land and Buildings Known as Teres House, Copse Road, And Land Lying to the North of East Denham Way, Fleetwood, FY7 7NY (5 components) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-1), 2020-21 (T-4) ...
15.47 MW
Land Adjacent to Stobarts Logistics, Off Branthwaite Road, Lillyhall, Workington, Cumbria, CA14 4ED (5 components) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.86 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (2 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (5 components) Geocoding Needed
• 2 x 1.55 MW Contianerised Generating Sets.
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2025-26 (T-4), 2021-22 (T-4) ...
13.39 MW
Loading map...
Showing 25 locations