Reciprocating engines

585 unique locations (2833 components) - Page 1 of 24

Wincham Lane, Wincham, Northwich, CW9 6DE (17 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Willow Holme Road, Carlisle, CA3 9PF (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Willow Farm Doncaster Road Tadcaster LS24 9PA (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Willand reserve Power EX15 2PJ (3 components)

16MW gas fired engines provide back up power to the local grid

Inactive • 2019-20 (T-1)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (9 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Whittington Rd, Barrow Hill, Chesterfield S43 2PW (4 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
Wheldale Energy Park Wheldale Road Castleford West Yorkshire WF10 2RT (2 components)

Gas fired reciprocating engines

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RT (5 components)

Gas reciprocating engines

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Wheldale 1 Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (4 components)

gas generating unit(s)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.22 MW
Whaley Road, Barnsley, S75 1HT (1 component)

The CMU Component will be made up of gas fired engines.

Inactive • 2022-23 (T-4)
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (3 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Westerham Road Sundridge Kent TN14 6ED (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Weighbridge Rd, Deeside CH5 2LL, UK (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (27 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
15.01 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (13 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.14 MW
Watling Road Bishop Auckland DL14 9AS (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Water Orton, Birmingham, B46 1NU (3 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (26 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Warren Park Way, Enderby, Leicester, LE19 4SA (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Warren House Farm, Rossington, DN11 0HP (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Visitors Car Park, Alexandra Park, WA10 3UJ (4 components)
• Diesel or gas generating station.
• gas generating station.
Inactive • 2020-21 (T-4), 2019-20 (T-1)
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (4 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17.10 MW
Loading map...
Showing 25 locations