Reciprocating engines

480 unique locations (3486 components) - Page 8 of 20

Long Acres Road Neston CH64 3RL (13 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.76 MW
Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke, RG24 8QW (5 components)

16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.42 MW
Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke RG24 8FL (7 components)

16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
45.08 MW
Llay Grid Capacity Site Llay Hall Farm Llay Wrexham LL12 0TH (4 components)
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
9.30 MW
llanddewi Brefi Road, Tregaron, SY25 6JP (5 components)
• Mixed fuel reciprocating engines
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2026-27 (T-4), 2023-24 (T-1)
6.31 MW
Liverton Business Park, Exmouth, Devon EX8 2NU (5 components)

A gas fuelled generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
12.37 MW
Liverton Business Park Exmouth, Devon, EX8 2NU (3 components)

A gas fuelled generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.66 MW
Lead Road, Chopwell, Tyne and Wear, NE40 4JP (10 components)
• 10 x 1mw gas generator units to be installed on designated land at Lead Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 11 x 1mw gas generator units to be installed on designated land at Lead Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Lead Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• ... and 2 more unique descriptions
Active • 2024-25 (T-4), 2023-24 (T-4) ...
116.04 MW
Langstone Power Generation Plant, Southmoor Lane, Havant, Hampshire, PO9 1JW (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.25 MW
Langage Solar Park, Lower Langage Farm, Plympton, Plymouth PL7 5AW (note Appendix 1 of Cover Letter) (1 component)

Three new 1.55MW gas reciprocating units connected at Langage Solar Park

Active • 2024-25 (T-4)
4.43 MW
Langage Solar Park, Lower Langage Farm, Plympton, Plymouth PL7 5AW (1 component)

Three new 1.55MW gas reciprocating units to be installed at Langage Solar Park

Active • 2027-28 (T-4)
4.39 MW
Land to the West of Chapterhouse Close, Ellesmere Port, CH65 4EL (2 components)
• 49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
• 49.9 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
Active • 2024-25 (T-4), 2023-24 (T-4)
94.53 MW
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (4 components)

Gas reciprocating engines

Active • 2026-27 (T-4), 2025-26 (T-4) ...
190.39 MW
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (6 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
284.29 MW
Land to the south of Anna?s Road, Blackpool, FY4 5JX (nearest postcode) (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land lying to the south of Anna?s Road, Blackpool, FY4 5JX (nearest postcode)

Active • 2024-25 (T-4)
44.28 MW
Land To The North Of 3 Haywood Way Hastings, TN35 4NR (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• CMU consisting of multiple reciprocating engines and alternators.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.19 MW
Land to the East of Bankfields Drive, Eastham, Wirral, CH62 0DG (1 component)

Reciprocating engines envisaged to be made up of multiple modules.

Active • 2024-25 (T-4)
19.04 MW
Land to north east of Electricity Substation, Fordbridge Lane, Blackwell DE55 5JY Alfreton (7 components)

New reciprocating gensets in acoustic enclosure

Active • 2024-25 (T-4)
6.99 MW
Land South of Harwich Road, Lawford, Manningtree, Essex, CO11 2LY (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
6.87 MW
LAND ON THE WEST SIDE OF TEWIN ROAD WELWYN GARDEN CITY AL7 1BH (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Reciprocating engines Not Prequalified AL7
Active • 2024-25 (T-4)
4.82 MW
Land on the west side of Progress Road, Eastwood, SS9 5PR (1 component)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4)
3.43 MW
Land on the west side of Northdown Hill, Broadstairs, CT10 3JJ (1 component)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4)
4.84 MW
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (15 components)
• Gas engine system capable of exporting electricity.
• Multiple gas engines capable of exporting electricity.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
190.12 MW
Loading map...
Showing 25 locations