1164 unique locations (5853 components) - Page 7 of 47

Stone Circle, A6, Shap, Cumbria, CA10 3PZ (2 components)

A new build, gas fuelled generation station.

Active • 2024-25 (T-4)
42.85 MW
Stockclough Lane Blackburn BB2 5JR (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
4.76 MW
Stillingfleet Colliery Cawood Road, Stillingfleet Moor, Stillingfleet, Yorkshire, YO19 6HS (5 components)
• 1 x Jenbacher 420 (1.4MW)
• Reciprocating Gas Engine(s)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.02 MW
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2022-23 (T-4)
3.41 MW
Steventon Road, Abingdon,OX13 6RW (1 component)

A new build 6MW gas fuelled generating station.

Active • 2024-25 (T-4)
5.71 MW
Steventon Road, Abingdon, OX13 6RW (4 components)
• 5 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• 8 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
25.19 MW
Stevenage Road Knebworth Stevenage SG2 8QQ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
Stevenage Road Knebworth Stevenage Hertfordshire SG3 6PX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Not Prequalified SG3
Inactive • 2023-24 (T-4)
7.12 MW
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN. (7 components)
• A New Build 5MW Gas Fuelled Generating Station.
• A New Build 8MW Gas Fuelled Generating Station.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
24.67 MW
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN (6 components)
• A new build 3MW gas fuelled generating station.
• A new build 8MW gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.56 MW
Station Road Peterborough Cambs PE7 2EX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
Station Road Forest Row RH18 5EN (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
3.81 MW
Station Road, Cuffley, EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Not Prequalified EN7
Active • 2024-25 (T-4)
7.14 MW
Stather Road, Flixborough, DN15 8RR (7 components)
• 2 x 1.2mw gas generator units to be installed on designated land at Stather Raod
• 2.4MW gas fired peaking power plant
• A gas fuelled generating station comprised of multiple reciprocating engines
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.10 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (16 components)
• 16 MW power plant comprising of 8 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.88 MW
Stangate Landfill Site, Off Quarry Hill Road, Borough Green, Kent, TN15 8PG (1 component)

The site comprises of gas reciprocating unit(s)

Inactive • 2022-23 (T-4)
3.62 MW
Springmill Road, Leeds LS12 1BS (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
6.66 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.37 MW
Sparrowhawk Road, Halesworth, East Suffolk, IP19 8QW (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
20.58 MW
Southmoor Lane, Havant, PO9 1JW (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Not Prequalified PO9
Active • 2024-25 (T-4)
4.76 MW
Southmoor Lane Havant Hampshire PO9 1JW (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
73.28 MW
SOUTH CLOSE ROSYTON SG8 5UH (10 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
11.43 MW
SOUTH CLOSE ROSYTON SG8 5UH (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
11.43 MW