Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

480 unique locations (3486 components) - Page 7 of 20

Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (5 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
15.57 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (15 components)
β€’ 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
β€’ 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
β€’ ... and 1 more unique description
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
120.38 MW
Merlin Park Burscough L40 8JY (15 components)

Works required to complete the site will include:- 1 Construction of a Grid Connection between the site and the Distribution Network 2 Construction of gas connection between the site and …

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
76.11 MW
Meek St, Royton, Oldham OL2 6HL (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active β€’ 2028-29 (T-4)
14.96 MW
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components)
β€’ Battery Storage Facility
β€’ Energy facility comprising of reciprocating engine sets and ancillary equipment.
β€’ Energy facility comprising of reciprocating engine sets.
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, West Midlands, B76 1AL (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active β€’ 2025-26 (T-1)
5.99 MW
Maybrook Road, Maybrook Business Park, Minworth, Sutton Coldfield, B76 1BE (15 components)
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
36.37 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (9 components)
β€’ Existing OCGT.
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
263.09 MW
Marshall Road, Plympton, Plymouth, PL7 4NW (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active β€’ 2024-25 (T-4)
11.33 MW
Marl Road, Knowsley Industrial Park, Kirkby, Knowsley, L33 7UH (1 component)

A new build, gas fueled generation station

Reciprocating engines Not Prequalified L33
Active β€’ 2025-26 (T-4)
19.09 MW
Marlborough Road, Royal Wootton Bassett, SN4 7SR (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Active β€’ 2024-25 (T-4)
6.78 MW
Markham Lane, Duckmanton, Chesterfield, S44 5HS (2 components)

Gas reciprocating engines as the generating unit.

Active β€’ 2027-28 (T-4)
Markham Lane Duckmanton Chesterfield S44 5HS (6 components)
β€’ Gas reciprocating engines
β€’ Gas reciprocating engines.
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
9.89 MW
Manvers, Callflex Business Park, South of Doncaster Road, Rotherham, S63 7EF (2 components)

Gas reciprocating engines as the generating unit.

Active β€’ 2027-28 (T-4)
Manvers Callflex Business Park South of Doncaster Road Rotherham S63 7EF (8 components)
β€’ Gas generating unit(s)
β€’ Gas reciprocating engines
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
12.79 MW
Mannelli House, Cowper Road, Gilwilly Industrial Estate, Penrith, CA11 9BN (4 components)
β€’ A gas fuelled electrical power generating unit comprising multiple reciprocating engines
β€’ A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
β€’ A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
14.27 MW
Mannaberg Way, Scunthorpe, East Yorkshire, DN15 8XF (14 components)
β€’ 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
127.16 MW
M65, Accrington BB5 5WE (8 components)
β€’ Gas fired reciprocating engines.
β€’ gas fired reciprocating engines
Active β€’ 2024-25 (T-1), 2020-21 (T-4) ...
39.41 MW
M1, Luton, LU5 6HR (3 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
93.20 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, Staffordshire,ST5 9JA (1 component)

Holditch Power will be a 9.36MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active β€’ 2024-25 (T-4)
8.72 MW
Β Luton Road, Fancott, Toddington LU5 6HT (11 components)
β€’ Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
17.16 MW
Low Wathcote Farm, A6108, Easby, Richmondshire, North Yorkshire, DL10 5DP (1 component)

A new build, gas fuelled generation station.

Active β€’ 2024-25 (T-4)
21.43 MW
Loraine Way, Bramford, IP8 4JU (2 components)
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
β€’ New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active β€’ 2026-27 (T-4), 2025-26 (T-4)
13.73 MW
Longridge Road, Preston, Lancashire PR2 5NQ (6 components)
β€’ Battery Storage Facility
β€’ Energy facility comprising of reciprocating engine sets and ancillary equipment.
β€’ Energy facility comprising of reciprocating engine sets.
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
Long Lane, Westhoughton, Bolton, Lancashire BL5 3QR (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Loading map...
Showing 25 locations