Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1159 unique locations (5745 components) - Page 6 of 47

The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (22 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.65 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
94.78 MW
The Bath Inn, Wheldon Road, Castleford WF10 2RY (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (16 components)
• 6 x reciprocating engines
• Aux. load separately metered
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Tewin Road, Welwyn Garden City, AL7 1BD (1 component)

New build power station comprised of multiple reciprocating engines.

Active • 2026-27 (T-4)
17.13 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.22 MW
Tarmac, Whitefield Road, Bredbury, SK6 2QP (2 components)

7MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Tarmac, Anderton Road, Small Heath, Birmingham, B11 1TG (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Tarbotthill Landfill Site Tarbothill Farm Bridge of Don Aberdeen AB23 8BQ (1 component)

Gas Fired Reciprocating Engine(s)

Inactive • 2022-23 (T-4)
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (3 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (1 component)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2020-21 (T-1)
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (8 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.64 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (3 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2022-23 (T-1)
5.61 MW
Sutton Landfill Site Huthwaite Road Sutton-In-Ashfield Mansfield, NG17 2HB (3 components)

Gas fired reciprocating engine(s)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Sutton Landfill Site Huthwaite Road Sutton-In-Ashfield Mansfield, NG17 2GZ (1 component)

The site comprises of gas reciprocating unit(s)

Inactive • 2022-23 (T-4)
Sutton Farm Sutton Lane Broughton Astley Leicester, LE9 6QF (26 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• Bio-liquid fuelled distribution connected generation station
• Gas fuelled distribution connected generation station
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Styal Road, Wythenshawe, Manchester, M22 5WB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
Stratford Road, Alcester, B49 6NN (9 components)
• 10 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 11 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stourton Estates, Hatton, LN8 5QL (1 component)

As indicated this CMU is linked to EDP112. EDP112 gained a T-4 CM contract in the CM16 auction. This CMU application enables a separate portion of a new build gas …

Inactive • 2022-23 (T-4)
STONE CROSS LANE GOLBORNE WA3 2SF (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
Stone Circle, Shap, Cumbria, CA10 3PZ (2 components)
• A new build gas fuelled generation station
• A new build, gas fuelled generation station
Active • 2027-28 (T-4)
42.46 MW
Loading map...
Showing 25 locations