Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

480 unique locations (3486 components) - Page 5 of 20

Rhodesia Power Limited, Highgrounds Industrial Estate Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.52 MW
Redscar Business Park, Preston, PR2 5NJ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2028-29 (T-4)
14.96 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (6 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
81.18 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (8 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.80 MW
Rear Grazing Land, Crescent Industrial Estate, Station Road, Southampton, Hampshire, SO16 0YD (3 components)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
37.66 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (27 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines.The Power plant is connected to the WPD distribution network and WWU gas network.
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
134.74 MW
Radstone Rd, Radstone, Brackley NN13 5PY (7 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
9.48 MW
QinetiQ Portsdown Technology Park, Southwick Rd, Portsmouth, PO6 3RU (1 component)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Not Prequalified PO6
Active • 2027-28 (T-4)
18.68 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (16 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Active • 2027-28 (T-4), 2026-27 (T-4) ...
35.67 MW
Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Alfreton DE55 4NX (4 components)

Gas fired peaking power plant

Active • 2028-29 (T-4), 2025-26 (T-1)
7.28 MW
Prowse's Lane, Axbridge, BS26 2HP. (4 components)

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.66 MW
Prince of Wales Road, Darnall, South Yorkshire, Sheffield, S9 4EX, United Kingdom (2 components)

A New Build gas generating station..

Active • 2028-29 (T-4), 2027-28 (T-4)
4.25 MW
Prince of Wales Energy Park Land off Skinner Lane Pontefract WF8 1HG (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
1.08 MW
President Way, Luton, LU2 9NW (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines Not Prequalified LU2
Active • 2025-26 (T-4)
6.87 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
11.03 MW
Plot D2, Kingdom Avenue, Westbury, Wiltshire, South West England, England, BA13 4EW (8 components)

A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
13.10 MW
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
0.33 MW
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (3 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
0.33 MW
Plot A Land at Severn Road Avonmouth BS10 7SE (7 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 25 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• ... and 1 more unique description
Active • 2025-26 (T-4), 2024-25 (T-4) ...
142.55 MW
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO91FA (2 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Hermitage Park
• A new build, gas fuelled generation station
Active • 2026-27 (T-4), 2025-26 (T-4)
38.13 MW
Plot 3, Forge Way, Knypersley, Staffordshire, ST8 7DN (3 components)

Knypersley Power will be a 7.012MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network

Active • 2028-29 (T-4), 2024-25 (T-4)
13.14 MW
PLOT 11 MID SUFFOLK BUSINESS PARK EYE IP23 7HU (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Phillips Lane, Colne, BB8 9PQ (5 components)

A gas fuelled generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
Petre Road, Oakenshaw, Clayton-le-Moors, Hyndburn, Lancashire, England, BB5 5JB (2 components)

A Distribution Connected gas fueled generating station.

Active • 2028-29 (T-4)
14.96 MW
Petre Road, Clayton-le-Moors, Lancashire BB5 5JG (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Loading map...
Showing 25 locations