Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1164 unique locations (5853 components) - Page 38 of 47

Cunliff Road, Blackburn, BB1 5SX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
2.38 MW
Cuffley Hill Cuffley Potters Bar Hertfordshire EN7 5HA (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.12 MW
Cuffley Hill Cuffley Potters Bar EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
Cuckoo Road, Nechells, Birmingham, B7 5TR (3 components)

New reciprocating genset in acoustic enclosure

Inactive • 2020-21 (T-4), 2019-20 (T-1)
14.99 MW
Crosby Power, Church Street, Bootle, L20 1AF (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.16 MW
Crookham Common Road, Thatcham, RG19 8BR (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
36.09 MW
Cps House, Stephenson Road, Severalls Industrial Park, Colchester, CO4 9QR (4 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.63 MW
CPG Power Manchester Rd, Carrington, Manchester M31 4AY, UK (3 components)
• This CMU [CGTN_4] will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
• This CMU will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
141.12 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
55.90 MW
Cotton Valley STW, Portway, Milton Keynes, MK15 9LZ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Inactive • 2022-23 (T-4)
0.01 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, Essex, CM9 5FA (9 components)
• 14MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
19.92 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, CM9 5FA (1 component)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
13.13 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (6 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2025-26 (T-1) ...
15.22 MW
Commercial Road, Bromborough, Birkenhead, Wirral CH62 3NL (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Commercial Road, Bromborough Birkenhead, Wirral.

Active • 2024-25 (T-4)
19.04 MW
Commerce Way Flitwick MK45 5BP (10 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17.14 MW
Commerce Way Flitwick MK45 5BP (4 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
17.14 MW
Collyland Road, Fishcross, FK10 3JN (2 components)

A new build, gas fuelled generation station.

Reciprocating engines Not Prequalified FK10
Active • 2025-26 (T-4), 2024-25 (T-4)
21.43 MW
Coldhurst Street, Oldham, OL1 2BQ (2 components)

A gas fuelled generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Cody Technology Park, Old Ively Road, Farnborough, Hampshire, GU14 0LX (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
15.03 MW
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Inactive • 2022-23 (T-4)
19.03 MW
Clifton Street, Miles Platting, M40 8HF (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.60 MW
Cliftonhall Road Newbridge Edinburgh EH28 8PW (1 component)

Multiple gas engine generators with an output to the distribution network of 10.5MW. To be installed on land at Newbridge in Edinburgh.

Inactive • 2022-23 (T-4)
9.99 MW
Clay Wheels Lane, Sheffield, S6 1LZ (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Clay Tye Road, Upminster, RM14 3PL, UK (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Inactive • 2022-23 (T-4)
46.14 MW
Loading map...
Showing 25 locations