Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

798 unique locations (3256 components) - Page 26 of 32

Devons Road, Bromley by Bow, London, E3 3BF (14 components)
• A gas fuelled generating station.
• A reciprocating gas engine CHP site providing hot water to a local district heating network.
Inactive • 2022-23 (T-3), 2018-19 (T-1) ...
0.78 MW
Derwent Power Plant, Holme Lane, Spondon, Derby, DE21 7NT (2 components)

CMU S23DPP will be formed of multiple individual generating units controlled centrally and exporting to the distribution system

Inactive • 2023-24 (T-4)
47.40 MW
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN (1 component)

A gas fuelled generating station.

Inactive • 2023-24 (T-4)
Deanprint, Cheadle Heath, Works, Stockport Road, Stockport, SK3 0PR (2 components)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Davy Road Astmoor Industrial Estate Runcorn WA7 1PZ (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.27 MW
Davy Road Astmoor Industrial Estate Runcorn WA7 1PZ (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Davy Drive Peterlee SR8 2JF (6 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
3.80 MW
Davy Drive Peterlee SR8 2JF (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 9QP (2 components)

The site comprises of gas reciprocating unit(s)

Inactive • 2022-23 (T-4)
Daneshill Landfill Site, Daneshill Road, Lound, Nr Retford, Nottinghamshire, DN22 8RB (2 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The site comprises of gas reciprocating unit(s)
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (9 components)
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.31 MW
Cut Throat Lane Witham Essex CM8 2SZ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-3)
Currock Road, Carlisle, Cumbria CA2 5AD (5 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-3)
19.00 MW
Cuffley Hill Cuffley Potters Bar Hertfordshire EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4)
7.12 MW
Cuffley Hill Cuffley Potters Bar EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Cuckoo Road, Nechells, Birmingham, B7 5TR (4 components)
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
• New reciprocating genset in acoustic enclosure
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Crookham Common Road, Thatcham, RG19 8BR (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
CPG Power Manchester Rd, Carrington, Manchester M31 4AY, UK (3 components)
• This CMU [CGTN_4] will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
• This CMU will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cotton Valley STW, Portway, Milton Keynes, MK15 9LZ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Inactive • 2022-23 (T-4)
Cottam EDF Energy (Cottam Power) Ltd, Outgang Lane, Cottam, Retford, DN22 0NP (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Power Station CMU 1 CT1-17 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station CMU 3 CT3-17 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
442.31 MW
Common Ln, Watnall, Nottingham NG16 1HD, UK (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Commercial Road, Birkenhead, Wirral, CH62 3NL (Please refer to 'Response Power - Reliance Supporting Letter T-4 2018' which is attached to the distribution connection agreement .zip file to further clarify CMU address) (3 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• The CMU Component is made up of new gas-fired engines.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Commerce Way Flitwick MK45 5BP (10 components)
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations