Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

476 unique locations (3384 components) - Page 18 of 20

Batleys Cash and Carry Talbot Road Fareham PO15 5RY (11 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2027-28 (T-4) ...
52.31 MW
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (4 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2023-24 (T-1) ...
33.68 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.63 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2023-24 (T-1) ...
11.32 MW
Balle Street, Darwen, Blackburn BB3 2AZ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.68 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (17 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.78 MW
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines
Active • 2024-25 (T-4), 2021-22 (T-4)
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-1)
Ashton Old Road, Openshaw, Manchester M11 1AA (7 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
34.26 MW
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Active • 2024-25 (T-4)
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

Active • 2028-29 (T-4)
46.28 MW
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (11 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
22.84 MW
3.07 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (16 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.12 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (3 components)

One Jenbacher CHP engine with a generation capacity of 3.36 MW (3)

Active • 2028-29 (T-4), 2021-22 (T-1) ...
3.12 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (11 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• Generating CMU comprising of a CHP asset producing energy from waste
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
12.87 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
85.60 MW
AL7 (37 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
117.60 MW
AL2 (73 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
95.86 MW
AL1 (123 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
273.15 MW
Adsworth Road, Stockport, SK3 8LF (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
28.28 MW
Abercorn Street, Paisley, PA3 4DF (7 components)

A new build, gas fuelled generation station. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
133.17 MW
Loading map...
Showing 25 locations