59 unique locations (832 components) - Page 3 of 3

Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
27.31 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.70 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.67 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.47 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (14 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.36 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (3 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
25.71 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (7 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
37.40 MW
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (2 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2024-25 (T-4)
15.24 MW
Loading map...