Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

326 unique locations (2637 components) - Page 12 of 14

Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
10.19 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2023-24 (T-1)
30.46 MW
Bowlers Croft, Basildon, SS14 3HH (3 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2022-23 (T-1)
Booth Lane, Sandbach, Cheshire CW11 3PY (1 component)

A gas fueled distribution connected generating station

Active • 2028-29 (T-4)
23.37 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (14 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
27.31 MW
Booker Cash and Carry Didcot OX11 7HJ (11 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.57 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (9 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
3.77 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.70 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (3 components)

An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.

Active • 2025-26 (T-1), 2024-25 (T-1)
12.70 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (1 component)

A 7.5MW new build gas generating station..

Active • 2025-26 (T-1)
7.01 MW
Bentinck Electricity Generating Plant Mill Lane Kirkby In Ashfield Nottinghamshire NG17 9LG (4 components)

Gas engine peaker plant providing capacity market, power trading and other balancing services.

Active • 2024-25 (T-4), 2021-22 (T-1)
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Active • 2025-26 (T-4)
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2027-28 (T-4) ...
131.72 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (14 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.67 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (5 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.62 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (23 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.71 MW
0.22 MW
Ashton Old Road, Openshaw, Manchester M11 1AA (7 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
68.54 MW
Ash Road, Protos, CH2 4RX (1 component)

49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Active • 2024-25 (T-4)
47.13 MW
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

Active • 2028-29 (T-4)
46.28 MW
Ashland Cottage Farm, Beck Lane, Sutton in Ashfield, NG17 3AH (11 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
30.46 MW
3.07 MW
Loading map...
Showing 25 locations