Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

326 unique locations (2637 components) - Page 10 of 14

Grand Union Canal Walk, Hayes UB3 4DG (4 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
93.20 MW
Grain Road, Isle of Grain, Rochester, ME3 0AB (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2021-22 (T-1)
Grain Road Isle of Grain Rochester ME3 0AB (8 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
26.61 MW
Generation Compound Land Off Titanium Road, Swansea, SA5 4SG (2 components)

A new build gas fuelled generation plant with ancilliary equipment.

Active • 2028-29 (T-4)
37.40 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.75 MW
Garden Lane Cadeby Doncaster DN5 7SN (2 components)

Gas reciprocating engines.

Active • 2025-26 (T-4), 2024-25 (T-1)
1.96 MW
Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
133.92 MW
Five Mile Drive, Upton Wold, Moreton-In-Marsh, WR12 7LD (6 components)
• New build site with gas reciprocating engines to replace diesel plant
• New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
• STOR diesel engines that will operate environmentally with mixed fuel
Active • 2028-29 (T-4), 2027-28 (T-4) ...
99.17 MW
Ffordd Penamser Road, Porthmadog, Gwynedd, LL49 9GB (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2022-23 (T-1)
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Active • 2025-26 (T-1)
37.21 MW
Felindre Rd, Pencoed, Bridgend, CF35 5HU (1 component)

A new build, gas fuelled generation station

Active • 2026-27 (T-4)
19.04 MW
Eyre Street, Birmingham, B18 7AD (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.67 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (17 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.71 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (29 components)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
95.49 MW
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (9 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.28 MW
Ellifoot Lane, Burstwick, HU12 9EB (6 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2025-26 (T-1) ...
29.03 MW
Eagle Business Park, Yaxley, PE7 3GP (13 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-4), 2023-24 (T-1) ...
34.27 MW
Drake Grove, Burndell Road, Yapton, Arundel, BN18 0HX (7 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4), 2025-26 (T-1) ...
47.67 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD (7 components)
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.44 MW
Dock Yard Power, Dock Yard Road, Ellesmere Port, CH65 4EF (9 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.91 MW
Dig Gate Lane, Rochdale, OL16 4NR (3 components)

4.4MW gas fired peaking power plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.45 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Dewi Road, Tregaron, SY25 6JP (2 components)

STOR diesel engines that will operate environmentally with mixed fuel

Active • 2025-26 (T-1)
12.36 MW
Loading map...
Showing 25 locations