Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

10 unique locations (35 components)

Warren House Farm, Rossington, DN11 0HP (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
19.03 MW
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.38 MW
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• Bio-liquid fuelled distribution connected generation station
• Gas fuelled distribution connected generation station
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
65.47 MW
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
19.03 MW
Pioneer Mill, Milltown St, Radcliffe, Manchester, M26 1WN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
19.03 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
102.99 MW
LAND AT HEATH BUSINESS PARK GRANGE WAY COLCHESTER ESSEX CO2 8GU (11 components)
• CMU consisting of a gas reciprocating engine and alternator
• CMU consisting of a gas reciprocating engine and an alternator
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.24 MW
Land at Coronet Way North, Salford, M50 1RE (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
38.06 MW
Briscoe Ln, Manchester, M40 2XP (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
19.03 MW
Ash Road, Protos, CH2 4LB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
8.56 MW
Loading map...
Showing 10 locations