Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1 unique locations (31 components)

Active MW: 15498.98 MW
Inactive MW: 34.05 MW
Land at Fordbridge Lane, Blackwell, DE55 5JY (31 components)
β€’ 20 MWs of multiple reciprocating generator units to be installed on designated land at Fordbridge Lane, Blackwell.
β€’ 20 MWs of reciprocating engine generation connecting into existing 33kV substation
β€’ 20 MWs of reciprocating engine generation connecting into existing 33kv substation
β€’ ... and 1 more unique description
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
26.55 MW
Loading map...
Showing 1 locations