Reciprocating engines

4 unique locations (79 components)

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One CHP engine in a horticultural environment with no auxilliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
286.73 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
• District heating implementation with one asset 1MW and no auxiliary load
Active • 2024-25 (T-1), 2023-24 (T-4) ...
12.92 MW
Loading map...