Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

17 unique locations (337 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
โ€ข A gas engine CHP site providing electricity & heat to the associated development
โ€ข A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (3 components)
โ€ข 2.6MW of demand reduction
โ€ข CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
โ€ข Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active โ€ข 2024-25 (T-1), 2023-24 (T-4)
0.09 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
โ€ข 6 x reciprocating engines
โ€ข Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
โ€ข Distribution Centre with behind the meter back-up generation.
Active โ€ข 2025-26 (T-4), 2023-24 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
โ€ข Existing Generator Battery Energy Storage System
โ€ข Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
โ€ข New Build Battery Energy Storage Systems
Active โ€ข 2025-26 (T-4), 2025-26 (T-1) ...
5.25 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
โ€ข 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
โ€ข 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
โ€ข Ratcliffe Unit 3 coal-fired unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (22 components)
โ€ข 8.3MW Gas Turbine installation
โ€ข Existing CCGT unit
โ€ข Marchwood CCGT
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3678.80 MW
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
โ€ข A gas fuelled generating station.
โ€ข Connah's Quay PS Unit 1 CCGT
โ€ข Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active โ€ข 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
land immediately adjacent to the existing Windyhill Electricity Grid Substation, North Of Baljaffray Road, Bearsden, East Dunbartonshire, G61 4PU. (12 components)
โ€ข 1 x hydro turbine & synchronous generator
โ€ข 3.600MW of demand reduction
โ€ข Lithium ion battery storage plant
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
41.27 MW
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
โ€ข 10.000MW DSR
โ€ข A gas fuelled generating station.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.66 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (10 components)
โ€ข 0.250MW Battery Energy Storage System
โ€ข 10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
โ€ข 5MW of demand reduction
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข N/A
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
3.45 MW
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (18 components)
โ€ข 3.6MW of demand reduction
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
11.11 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข ROCable hydro units within the BMU are not included in the CMU.
โ€ข Turbomach M50 Natural Gas fired CHP unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
77.42 MW
4 Finway Road Hemel Hempstead HP2 7PT (11 components)
โ€ข 14.710 MW CHP generation
โ€ข Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
โ€ข Onsite load reduction and back up generation behind the meter on multiple sites
Active โ€ข 2024-25 (T-4), 2022-23 (T-3) ...
4.76 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
โ€ข 1.200MW BESS
โ€ข A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
โ€ข District heating implementation of two gas CHP engines with no auxilliary load
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
9.27 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
โ€ข Battery Storage Plant
โ€ข Load reduction on site supported by non-exporting standby generation.
โ€ข Reciprocating genset in acoustic enclosure
Active โ€ข 2025-26 (T-4), 2023-24 (T-4) ...
53.56 MW
Loading map...
Showing 17 locations