42 unique locations (638 components) - Page 1 of 2

Yearsley - Belle Eau Park, Belle Eau Park, Bilsthorpe, Newark NG22 8TX, UK (19 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข New reciprocating gensets in acoustic enclosure
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
29.79 MW
Southend University Hospital, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (12 components)
โ€ข A new build 19MW battery energy storage system
โ€ข CHP
โ€ข New reciprocating gensets in acoustic enclosure
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3) ...
2.45 MW
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom (58 components)
โ€ข A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข Wind Turbine Generators x 15
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
64.94 MW
Lubenham Road, Market Harborough, Leicestershire, LE16 9NP *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (5 components)
โ€ข Array of lithium ion batteries in a power generation environment, proving power to National Grid. Change of use of land from agricultural to new build generation.
โ€ข New reciprocating gensets in acoustic enclosure
โ€ข The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-4) ...
Land to north east of Electricity Substation, Fordbridge Lane, Blackwell DE55 5JY Alfreton (6 components)
โ€ข A standby diesel generator on a waster water treatment works.
โ€ข New reciprocating gensets in acoustic enclosure
โ€ข The CMU Component is made up of gas-fired engines.
Active โ€ข 2024-25 (T-4), 2023-24 (T-4) ...
20.97 MW
Land off Wickham Rd, Grimsby DN31 3SW (3 components)

New reciprocating gensets in acoustic enclosure

Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3)
Land off Sookholme Road, Vernon Street Industrial Estate, Shirebrook, Mansfield, NG20 8SG (24 components)
โ€ข Reciprocating genset
โ€ข The CMU is a gas plant, capable of running in either OCGT or CCGT modes
โ€ข The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.56 MW
Land off Salmon Lane, Annesley, Nottinghamshire NG15 0DF (10 components)
โ€ข New reciprocating gensets in acoustic enclosure
โ€ข Onsite load reduction and back up generation behind the meter on multiple sites
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW
Land off Orwell Street, Grimsby, DN31 3HF (3 components)
โ€ข New reciprocating gensets in acoustic enclosure
โ€ข To be confirmed once CMU components are known
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3)
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
โ€ข A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
โ€ข Battery energy storage unit
โ€ข This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
Land off High View Road, South Normanton, Bolsover, Derbyshire, DE55 2EY (12 components)
โ€ข Component has yet to be procured.
โ€ข Reciprocating genset
โ€ข The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
Active โ€ข 2027-28 (T-4), 2026-27 (T-4) ...
9.19 MW
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (11 components)
โ€ข A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.
โ€ข A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity.
โ€ข New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active โ€ข 2025-26 (T-4), 2025-26 (T-1) ...
15.25 MW
Land At Woolaston Road, Woolaston Road, Redditch, Worcestershire B98 7SG Redditch (7 components)
โ€ข Battery Storage Plant
โ€ข Heysham 1 Power Station CMU 2: [HY1223] T_HEYM12
โ€ข New reciprocating gensets in acoustic enclosure
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
6.52 MW
Land at Woolaston Road, Park Farm Industrial Estate, Redditch, B987SG (11 components)
โ€ข A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
โ€ข BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
โ€ข New reciprocating gensets in acoustic enclosure
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-4) ...
18.60 MW
Land At Wolverhampton Powerhouse, Commercial Road, WV1 3QS. (4 components)
โ€ข 3 x 2.5 MW gas generator units to be installed at Land At Wolverhampton Powerhouse, Commercial Road, WV1 3QS.
โ€ข New reciprocating gensets in acoustic enclosure
Inactive โ€ข 2023-24 (T-4), 2023-24 (T-1)
21.42 MW
Land at Orwell Street, East Marsh, Grimsby DN31 3HF Grimsby (4 components)
โ€ข N/A
โ€ข New reciprocating gensets in acoustic enclosure
โ€ข one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active โ€ข 2024-25 (T-4), 2024-25 (T-1) ...
5.47 MW
Land At Mitchells Industrial Park, Bradberry Balk Lane, Wombwell, Barnsleym, S73 8HR (17 components)
โ€ข 5 MW of demand reduction
โ€ข CHP Unit
โ€ข New reciprocating gensets in acoustic enclosure
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-4) ...
7.44 MW
Land At Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire, ST5 9JA (4 components)
โ€ข Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
โ€ข New reciprocating gensets in acoustic building/enclosure
โ€ข The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3)
Land at Lymedale Business Park, Holditch Road, Newcastleunder-Lyme, Staffordshire,ST5 9JA (8 components)
โ€ข 20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข New reciprocating gensets in acoustic building/enclosure
Active โ€ข 2026-27 (T-4), 2023-24 (T-4) ...
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (25 components)
โ€ข 1,000MW electricity interconnector between GB and Belgian transmission systems. The Nemo Link interconnector will consist of subsea and underground cables connected to a converter station in each country, which will allow electricity to flow in either direction between the two countries. Nemo Linkยฎ will build the converter station on an 8 hectare site, formerly occupied by the Richborough Power Station, which now forms part of the Richborough Energy Park proposals. A similar converter station will be built in the industry zone Herdersbrug in Bruges.
โ€ข Battery energy storage unit
โ€ข Two gas CHP in a horticultural environment with no aux load
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.52 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (30 components)
โ€ข BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
โ€ข Battery storage unit
โ€ข New reciprocating gensets in acoustic enclosure
Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
10.42 MW
Land at Fordbridge Lane, Blackwell, DE55 5JY. (19 components)
โ€ข Reciprocating engines
โ€ข Reciprocating genset
Active โ€ข 2027-28 (T-4), 2026-27 (T-4) ...
16.99 MW
Land at Enterprise Court, Corby, NN18 8ES (62 components)
โ€ข Gas fired reciprocating engines.
โ€ข N/A
โ€ข Reciprocating genset
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
48.47 MW
Land at Common Side Lane, Featherstone, WF7 6RA (10 components)

New reciprocating gensets in acoustic enclosure

Inactive โ€ข 2023-24 (T-4), 2022-23 (T-3) ...
7.44 MW
Loading map...
Showing 25 locations