Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

111 unique locations (1217 components) - Page 1 of 5

Worset Lane, Hartlepool, TS27 3BQ (6 components)

A new build, gas fuelled generation station (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
92.98 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.23 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (3 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
Active • 2028-29 (T-4), 2017-18 (T-1)
3.08 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (20 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
74.02 MW
Whitwell Energy Park Southfield Lane Whitwell Derbyshire S80 3LH (4 components)

Gas reciprocating engines.

Active • 2028-29 (T-4), 2026-27 (T-4) ...
4.10 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)

Gas reciprocating engines.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.72 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.11 MW
Warne Road, Weston Super-Mare, BS23 9JZ (2 components)

New-build gas reciprocating engine.

Active • 2028-29 (T-4)
37.96 MW
Wainwright Street, Hollins, Dukinfield, Tameside, Greater Manchester, England, SK16 5PL (2 components)

A Distribution Connected gas fueled generating station.

Active • 2028-29 (T-4)
14.96 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (23 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• CMU consisting of multiple reciprocating engines and alternators
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.74 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (18 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.06 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.65 MW
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (3 components)
• New build site with gas reciprocating engines to replace diesel plant
• New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.
Active • 2028-29 (T-4), 2027-28 (T-4)
56.27 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.65 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (32 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
18.39 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (8 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.64 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (3 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2022-23 (T-1)
5.61 MW
Stather Road, Flixborough, DN15 8RR (7 components)
• 2 x 1.2mw gas generator units to be installed on designated land at Stather Raod
• 2.4MW gas fired peaking power plant
• A gas fuelled generating station comprised of multiple reciprocating engines
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.24 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (16 components)
• 16 MW power plant comprising of 8 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.49 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.47 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.92 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (14 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2.36 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (16 components)
• Gas reciprocating engines. (4)
• Gas reciprocating engines
Active • 2028-29 (T-4), 2026-27 (T-4) ...
13.75 MW
Shirebrook 1 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (4 components)
• 4x Jenbacher JGS 616 GS
• Gas reciprocating engines.
Active • 2028-29 (T-4), 2017-18 (T-1)
6.84 MW
Loading map...
Showing 25 locations