Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

91 unique locations (659 components) - Page 1 of 4

Active MW: 15498.98 MW
Inactive MW: 34.05 MW
Yew Tree Nursery, Guildford Road, Cranleigh, GU6 8PA (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Cranleigh Cranleigh Not Prequalified GU6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
11.42 MW
Wheldale Generation Site, Wheldon Road, Castleford, West Yorkshire, WF10 2RT (7 components)

Gas reciprocating engines. (3)

Reciprocating engines ALKANE ENERGY UK LIMITED CMM Portfolio CMM Portfolio +4 more WF10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.94 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Reciprocating engines Storage (Duration 2h) STOR 108 LTD HAMILTON LANE POWER LIMITED New Build Generating CMU Hamilton Hamilton +3 more OL4
Active • 2026-27 (T-4), 2024-25 (T-4) ...
25.00 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (15 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Watson Street Power Station Watson Street Power Station +7 more WA9
Active • 2029-30 (T-4), 2027-28 (T-4) ...
22.10 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)

A 6.9MW gas fuelled generating station. (3)

Reciprocating engines GORING POWER LTD New Build Generating CMU GORING GORING +1 more RG8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.53 MW
Villa Power, Reeves Lane, Roydon, Harlow, CM19 5LE (2 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site

Active • 2029-30, 2026-27
5.36 MW
Unit 7, Cambridgeshire, Business Park, Angel Drove, Ely CB7 4DT (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED Angel Drove Power Angel Drove Power +1 more Not Prequalified CB7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.44 MW
Toray 2, Toray Textiles ImportExport, Crown Farm Way, Mansfield, Nottingham, NG19 0FN (4 components)
• Gas reciprocating engines (2)
• Gas reciprocating engines.
Reciprocating engines ALKANE ENERGY UK LIMITED Toray Textiles Toray Textiles +2 more NG19
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.09 MW
Titanium Road, Cocket, Swansea, SA5 4NH (6 components)
• STOR diesel engines that will operate environmentally with mixed fuel (2)
• New build site with gas reciprocating engines to replace diesel plant
Reciprocating engines GFI73 LTD Refurbishing Generating CMU Swansea Swansea SA5
Active • 2026-27 (T-4), 2025-26 (T-4) ...
18.96 MW
Thurscoe Business Park Barrowfield Rd Thurscoe Rotherham S63 0DB (7 components)

Gas reciprocating engines

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.28 MW
The Manorway, Stanford-le-Hope, SS17 9LL (9 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.94 MW
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (15 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Long Barrow Power Station Sevington Power Station +7 more TN24
Active • 2029-30 (T-4), 2026-27 (T-4) ...
18.81 MW
Tewin Road, Welwyn Garden City, AL7 1BD (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines WGC ENERGY CENTRE LIMITED New Build Generating CMU WGC ENERGY CENTRE LIMITED Not Prequalified AL7
Active • 2026-27 (T-4)
17.13 MW
Southmoor Lane Havant Hampshire PO9 1JW (3 components)
• New Build Generating CMU comprising of battery storage and associated plant.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2023-24 (T-4) ...
7.09 MW
Shirebrook 2 , Acreage Lane , Shirebrook , Nottinghamshire , NG20 8RN (12 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.36 MW
Shirebrook 1, Acreage Lane, Shirebrook, Nottinghamshire, NG20 8RN (13 components)
• 4x Jenbacher JGS 616 GS
• Gas reciprocating engines
• Gas reciprocating engines as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.75 MW
Severn Road, Almondsbury, Bristol, BS10 7GD (3 components)
• A new build, gas fuelled generation station
• A new build, gas fuelled generation station.
Reciprocating engines AVONMOUTH PROJECT CO LIMITED New Build Generating CMU Avonmouth Shapfell 1 +1 more BS10
Active • 2027-28 (T-4), 2026-27 (T-4)
47.08 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (4 components)

Brigg Gas Peaker

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU 8RESAK 8RESAK DN20
Active • 2026-27 (T-4), 2025-26 (T-4) ...
135.85 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (9 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (ROCHESTER) LIMITED New Build Generating CMU Rochester Rochester +1 more ME2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.91 MW
Rhodesia Power Limited, Highgrounds Industrial Estate, Highgrounds road, Rhodesia, Worksop, S80 3AT (4 components)

The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …

Active • 2026-27 (T-4), 2025-26 (T-1) ...
37.82 MW
Rectory Field, Cards Road, Sandon, CM2 7AE (7 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
46.26 MW
Radstone Rd, Radstone, Brackley NN13 5PY (6 components)
• A new build diesel or gas grid support plant
• An Existing diesel grid support plant
• An Exiting diesel grid support plant
Reciprocating engines OCGT and Reciprocating Engines HALL FARM ENERGY LIMITED Existing Generating CMU Hall Farm Hall Farm +2 more NN13
Active • 2026-27 (T-1), 2025-26 (T-1) ...
14.04 MW
Pye Bridge Industrial Estate, Somercotes, Alfreton, DE55 4NX (9 components)
• Additional reciprocating gas engines running on natural gas returned to service
• Reciprocating gas engines running on natural gas
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) PYEBRIDGE POWER LTD Existing Generating CMU Gas Generation Pye Bridge Gas Generation Pye Bridge +4 more DE55
Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.72 MW
Pulrose Power Station, Pulrose Rd, Douglas, Isle of Man, IM2 1AD (2 components) Geocoding Needed

Diesel Peaking Plant Located Adjacent to CCGT Plant

Active • 2029-30, 2026-27
0.15 MW
Loading map...
Showing 25 locations