Reciprocating engines

10 unique locations (251 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
โ€ข A gas engine CHP site providing electricity & heat to the associated development
โ€ข A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
โ€ข Load reduction on site supported by non-exporting standby generation.
Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
โ€ข 6 x reciprocating engines
โ€ข Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
โ€ข Distribution Centre with behind the meter back-up generation.
Active โ€ข 2025-26 (T-4), 2023-24 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (11 components)
โ€ข Existing Generator Battery Energy Storage System
โ€ข Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
โ€ข New Build Battery Energy Storage Systems
Active โ€ข 2025-26 (T-4), 2025-26 (T-1) ...
5.25 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (22 components)
โ€ข 8.3MW Gas Turbine installation
โ€ข Existing CCGT unit
โ€ข Marchwood CCGT
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
3678.80 MW
land immediately adjacent to the existing Windyhill Electricity Grid Substation, North Of Baljaffray Road, Bearsden, East Dunbartonshire, G61 4PU. (12 components)
โ€ข 1 x hydro turbine & synchronous generator
โ€ข 3.600MW of demand reduction
โ€ข Lithium ion battery storage plant
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
41.27 MW
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 4NJ (42 components)
โ€ข 10.000MW DSR
โ€ข A gas fuelled generating station.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
21.66 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (30 components)
โ€ข Gas fired reciprocating engines.
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 MW.
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
ABP Ellesmere, The Abattoir, Hordley, Ellesmere SY12 9BL, United Kingdom (17 components)
โ€ข Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
โ€ข ROCable hydro units within the BMU are not included in the CMU.
โ€ข Turbomach M50 Natural Gas fired CHP unit
Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
77.42 MW
323 Avebury Boulevard, MILTON KEYNES MK9 2GA (16 components)
โ€ข 1.200MW BESS
โ€ข A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
โ€ข District heating implementation of two gas CHP engines with no auxilliary load
Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
9.27 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
โ€ข Battery Storage Plant
โ€ข Load reduction on site supported by non-exporting standby generation.
โ€ข Reciprocating genset in acoustic enclosure
Active โ€ข 2025-26 (T-4), 2023-24 (T-4) ...
53.56 MW
Loading map...
Showing 10 locations