Reciprocating engines

2 unique locations (6 components)

Active MW: 15498.98 MW
Inactive MW: 34.05 MW
Land off Main Road, Weston, CW2 5LD (3 components)
β€’ 20 MWs of multiple reciprocating generator units to be installed on designated land off main Road, Weston.
β€’ 20 MWs of reciprocating engine generation connecting into existing 33kV substation
β€’ 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
Land at Thornton Lane, Markfield, LE67 9TU (3 components)
β€’ 20 MWs of reciprocating engine generation connecting into existing 33kV substation
β€’ 20 MWs of reciprocating engine generation connecting into existing 33kv substation
β€’ 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 2 locations