Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

156 unique locations (935 components) - Page 1 of 7

Wincham Lane, Wincham, Northwich, CW9 6DE (15 components)
• N/A
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (7 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.07 MW
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (26 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
15.01 MW
UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST, GLENFIELD CLINIC, GROBY ROAD, LEICESTER, LE3 9QP (10 components)
• A 20MW New Build gas fuelled generating station.
• CHP plant
• New build battery
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit D Kendale Road Scunthorpe DN16 1DT (8 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2020-21 (T-1) ...
3.81 MW
Unit D Kendale Road Scunthorpe DN16 1DT (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2020-21 (T-1) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (13 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.91 MW
Unit 27A Aber park Aber Road Flint CH6 5EX (8 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Unit 27A Aber park Aber Road Flint CH6 5EX (4 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Unit 27A Aber park Aber Road Flint CH6 5EP (10 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Unit 27A Aber park Aber Road Flint CH6 5EP (6 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Trumps Farm Landfill Site Kitsmead Lane Chertsey Surrey KT16 0DS (4 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engines
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Trumps Farm Landfill Site Kitsmead Lane Chertsey Surrey KT16 0DS (3 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engines
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Tickhill Road, Rotherham, South Yorkshire, S66 7QW (12 components)
• Gas fired generating unit(s)
• Generating Unit 2
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2026-27 (T-4), 2023-24 (T-4) ...
29.74 MW
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (3 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (3 components)
• CMU consisting of a gas reciprocating engine and alternator
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Solar T70 Based CHP System
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (2 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Sutton Farm Sutton Lane Broughton Astley Leicester, LE9 6QF (31 components)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New build power station comprised of multiple reciprocating engines.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.71 MW
Southend University Hospital, Trust Prittlewell Chase, Southend-on-Sea, Westcliff on-Sea, SS0 0RY (12 components)
• A new build 19MW battery energy storage system
• CHP
• New reciprocating gensets in acoustic enclosure
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.45 MW
SOUTH CLOSE ROSYTON SG8 5UH (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.74 MW
Solway Trading Estate Maryport Cumbria CA15 8NF (4 components)
• Connah's Quay PS Unit 2 CCGT
• New build power station comprised of multiple reciprocating engines.
Inactive • 2022-23 (T-3), 2020-21 (T-1) ...
Solway Trading Estate Maryport Cumbria CA15 8NF (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Sherburn in Elmet Leeds LS25 6JG (6 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Sherburn in Elmet Leeds LS25 6JG (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Loading map...
Showing 25 locations