Open Cycle Gas Turbine (OCGT)

91 unique locations (2011 components) - Page 1 of 4

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (8 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2596.64 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (9 components)
Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY COMPANY, LTD. Spalding Energy Expansion Spalding Energy Expansion PE11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2596.64 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (28 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3608.42 MW
Victory Road, Derby, Derbyshire, DE24 9HX (9 components)

Existing OCGT. (3)

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Derby Cogen Ltd Derby Cogen Ltd +5 more DE24
Active • 2029-30 (T-4), 2028-29 (T-4) ...
203.40 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2191.04 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (12 components)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
2917.36 MW
Sutton Bridge Power Station, Centenary Way, Sutton Bridge, Lincolnshire, PE12 9TF (16 components)
• Existing CCGT (2)
• Existing CCGT to be refurbished
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1551.59 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (18 components)
Combined Cycle Gas Turbine (CCGT) SUTTON BRIDGE POWER GENERATION Existing Generating CMU Sutton Bridge Sutton Bridge +1 more PE12
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3095.02 MW
Staythorpe Power Station, Staythorpe, Newark, Nottinghamshire, NG23 5PS (44 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (44 components)
Combined Cycle Gas Turbine (CCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_STAY-1 CMU_STAY-2 +2 more NG23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4893.37 MW
Severn Power Station, West Nash Road, Nash, Newport, NP18 2BZ (22 components)
• Existing CCGT Unit
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Severn Unit 1 and 2 Severn Unit 10 +9 more NP18
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3095.02 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (22 components)
Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Existing Generating CMU Severn Unit 10 Severn Unit 20 +1 more NP18
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3095.02 MW
Seabank Power Limited, Severn Road, Hallen, Bristol BS10 7SP (22 components)
• Multi Shaft CCGT (Module 1) (2)
• Single Shaft CCGT (Module 2)
Combined Cycle Gas Turbine (CCGT) SEABANK POWER LIMITED Seabank 1 and 2 Seabank 1 and 2 +1 more BS10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3401.60 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (24 components)
Combined Cycle Gas Turbine (CCGT) SEABANK POWER LIMITED Existing Generating CMU Seabank 1 and 2 BS10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4521.95 MW
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (24 components)
• Multi Shaft CCGT (Module 1)
• Single Shaft CCGT (Module 2)
Combined Cycle Gas Turbine (CCGT) SEABANK POWER LIMITED Existing Generating CMU Seabank 1 and 2 BS10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4521.95 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (23 components)
• Battery Storage Unit
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
Active • 2029-30 (T-4), 2028-29 (T-4) ...
3497.57 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Gas turbine generator
Active • 2028-29 (T-4), 2027-28 (T-4) ...
114.55 MW
Ratcliffe-on-Soar, Nottingham, NG11 0EE (60 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
505.30 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (60 components)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
505.30 MW
Power Station Road, Isle of Grain, Rochester, ME3 0AR (60 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
Active • 2029-30 (T-4), 2028-29 (T-4) ...
5326.18 MW
Loading map...
Showing 25 locations