Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

53 unique locations (1037 components) - Page 1 of 3

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components) Geocoding Needed
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
β€’ Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
462.46 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (8 components) Geocoding Needed
β€’ A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
β€’ A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
β€’ A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4736.21 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components) Geocoding Needed
β€’ West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
β€’ West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
β€’ West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7351.35 MW
Victory Road, Derby, Derbyshire, DE24 9HX (8 components) Geocoding Needed
β€’ Existing OCGT.
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Derby Cogen Ltd Derby Cogen Ltd +5 more DE24
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
352.98 MW
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components) Geocoding Needed

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7186.80 MW
Sutton Bridge Power Station, Centenary Way, Sutton Bridge, Lincolnshire, PE12 9TF (16 components) Geocoding Needed
β€’ Existing CCGT
β€’ Existing CCGT to be refurbished
β€’ Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4290.96 MW
Staythorpe Power Station, Staythorpe, Newark, Nottinghamshire, NG23 5PS (44 components) Geocoding Needed
β€’ Staythorpe 1 - CCGT MSID: 7210
β€’ Staythorpe 2 - CCGT MSID: 7210
β€’ Staythorpe 4 - CCGT MSID: 7210
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
14917.07 MW
Severn Power Station, West Nash Road, Nash, Newport, NP18 2BZ (18 components) Geocoding Needed
β€’ Existing CCGT Unit
β€’ Existing CCGT Unit which is to be refurbished
β€’ Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2254.19 MW
Seabank Power Limited, Severn Road, Hallen, Bristol BS10 7SP (22 components) Geocoding Needed
β€’ Multi Shaft CCGT (Module 1)
β€’ Single Shaft CCGT (Module 2)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4406.69 MW
Rosper Road, Immingham, North Lincolnshire, DN40 3DZ (18 components) Geocoding Needed
β€’ Battery storage unit
β€’ Gas CHP on South bank of river Humber providing electricity and industrial steam
β€’ New build gas reciprocating multi-engine generating plant
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
11434.68 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (11 components) Geocoding Needed
β€’ Battery Storage Station
β€’ Gas reciprocating engines as the generating unit.
β€’ Open cycle gas turbine as the generating unit.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
174.30 MW
Ratcliffe-on-Soar, Nottingham, NG11 0EE (60 components) Geocoding Needed
β€’ Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
β€’ Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
β€’ Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8570.86 MW
Power Station Road, Isle of Grain, Rochester, ME3 0AR (55 components) Geocoding Needed
β€’ Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
β€’ Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
β€’ OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6629.16 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (15 components) Geocoding Needed
β€’ Peterhead 1
β€’ Peterhead CCGT
β€’ Peterhead CCGT for Delivery Year 2018/19 only
Combined Cycle Gas Turbine (CCGT) SSE THERMAL GENERATION (SCOTLAND) LIMITED Existing Generating CMU Peterhead Peterhead +12 more AB42
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
13832.91 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (4 components) Geocoding Needed

Existing OCGT plant.

Open Cycle Gas Turbine (OCGT) RIVER NENE POWER LIMITED Existing Generating CMU Peterborough Power Peterborough Power +2 more PE1
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
922.24 MW
Pembroke Power Station, Pembroke, Dyfed, SA71 5SS (55 components) Geocoding Needed
β€’ Pembroke 21 - CCGT MSID: 7237
β€’ Pembroke 41 - CCGT MSID: 7237
β€’ Pembroke 51 - CCGT MSID: 7237
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
19010.04 MW
Newton Aycliffe, CO Durham DL5 6EA (15 components) Geocoding Needed
β€’ Existing Gas Engine
β€’ This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
23.41 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (22 components) Geocoding Needed
β€’ The CMU is a Open Cycle Gas Turbine (OCGT)
β€’ The CMU is a combined cycle gas turbine
β€’ The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT) CORBY POWER LIMITED Existing Generating CMU New Build Generating CMU Corby_1 Corby_1 +12 more NN17
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4476.34 MW
Medway Power Station, Rochester, Medway, ME3 0AG (15 components) Geocoding Needed
β€’ Medway
β€’ Medway CCGT
Combined Cycle Gas Turbine (CCGT) MEDWAY POWER LIMITED Existing Generating CMU Medway Medway +12 more ME3
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
9332.28 MW
Marsh Green Industrial Park, Marsh Barton Trading Estate, Exeter, Devon, EX2 8NY (8 components) Geocoding Needed
β€’ Existing OCGT.
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
305.00 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (10 components) Geocoding Needed
β€’ Gensets 1. 2 & 3
β€’ Marchwood CCGT
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8313.73 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (10 components)

Marchwood CCGT (3)

Combined Cycle Gas Turbine (CCGT) SSE ENERGY SUPPLY LIMITED Existing Generating CMU Marchwood Marchwood +8 more SO40
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2519.70 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (10 components) Geocoding Needed
β€’ Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
β€’ Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill +3 more BB2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
330.67 MW
Little Barford Power Station, Little Barford, St Neots, PE19 6YT (22 components) Geocoding Needed
β€’ Little Barford 1 CCGT
β€’ Little Barford 1 CCGT MSID: 4052
β€’ Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6950.00 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components) Geocoding Needed
β€’ A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
β€’ A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
β€’ Combined Cycle Gas Turbine plant
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Damhead Creek Damhead Creek +9 more ME3
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8593.66 MW
Loading map...
Showing 25 locations