Open Cycle Gas Turbine (OCGT)

17 unique locations (273 components)

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (1 component)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
18.70 MW
Sutton Bridge Power Station, Centenary Way, Sutton Bridge, Lincolnshire, PE12 9TF (16 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4290.96 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (3 components)

Existing CCGT (3)

Combined Cycle Gas Turbine (CCGT) SUTTON BRIDGE POWER GENERATION Existing Generating CMU Sutton Bridge Sutton Bridge +1 more PE12
Active • 2025-26 (T-1), 2024-25 (T-1) ...
1551.59 MW
Severn Power Station, West Nash Road, Nash, Newport, NP18 2BZ (18 components)
• Existing CCGT Unit
• Existing CCGT Unit which is to be refurbished
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2254.19 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (3 components)

Existing CCGT Unit (2)

Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Existing Generating CMU Severn Unit 10 Severn Unit 20 +1 more NP18
Active • 2025-26 (T-1), 2024-25 (T-1)
1551.59 MW
Ratcliffe-on-Soar, Nottingham, NG11 0EE (60 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8570.86 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (16 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590 (2)
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
Coal Open Cycle Gas Turbine (OCGT) UNIPER UK LIMITED Existing Generating CMU Ratcliffe GT2 Ratcliffe GT2 +13 more NG11
Active • 2025-26 (T-1), 2023-24 (T-1) ...
475.11 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (22 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT) CORBY POWER LIMITED Existing Generating CMU New Build Generating CMU Corby_1 Corby_1 +12 more NN17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4476.34 MW
Medway Power Station, Rochester, Medway, ME3 0AG (15 components)
• Medway
• Medway CCGT
Combined Cycle Gas Turbine (CCGT) MEDWAY POWER LIMITED Existing Generating CMU Medway Medway +12 more ME3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9332.28 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (10 components)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill +3 more BB2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
330.67 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas power facility on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (44 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.
Coal OCGT Coal/biomass Open Cycle Gas Turbine (OCGT) DRAX POWER LIMITED Existing Generating CMU DRAX Unit 10 DRAX Unit 12 +29 more YO8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3437.83 MW
Drax Power Station, Drax, Selby, YO8 8PH (18 components)
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2382.82 MW
Chickerell Generation Site, Off Radipole Lane, Chickerell, Weymouth, DT3 4PA (12 components)

1 x OCGT

Open Cycle Gas Turbine (OCGT) SSEPG (OPERATIONS) LIMITED Existing Generating CMU Chickerell Chickerell +10 more DT3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
534.99 MW
Cheshire Power Station, North Road, Ellesmere Port, South Wirral, CH65 1AF (10 components)
• Modular reciprocating engines
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
398.78 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (4 components)

One (1) Open Cycle Gas Turbine MSID: 7382 (3)

Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_CHEGT1 CMU_CHEGT1 +2 more CH65
Active • 2025-26 (T-1), 2024-25 (T-1) ...
124.05 MW
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (15 components)

1 x OCGT

Active • 2028-29 (T-4), 2027-28 (T-4) ...
623.88 MW
Loading map...
Showing 17 locations