33 unique locations (235 components) - Page 1 of 2

Active MW: 111795.11 MW
Inactive MW: 832.90 MW
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
10.86 MW
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (8 components)
• A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. Each turbine is individually metered with output being the total of all three turbines net of any auxillary load.
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4736.21 MW
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT) WEST BURTON B LIMITED Existing Generating CMU West Burton B Power Station CMU 1 West Burton B Power Station CMU 1 +17 more DN22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7351.35 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant
• A new Open Cycle Gas Turbine peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) HIRWAUN POWER LIMITED New Build Generating CMU Hirwaun Power OCGT Hirwaun Power OCGT +2 more CF44
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1136.65 MW
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited New Build Generating CMU Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
4320.00 MW
RWE Cogen UK Limited, North South Access Road, Seal Sands, Middlesbrough, TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
54.00 MW
RWE Cogen UK (Hythe) Ltd, Charleston Road, Hardley, Hythe, Southampton, SO45 3BP (4 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
94.21 MW
Rockingham South, Smoke Land, Avonmouth, BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
• The CMU will consist of 2 MW's of containerised battery storage.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
40.21 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) PROGRESS POWER LIMITED New Build Generating CMU Progress Power OCGT Progress Power OCGT +2 more IP23
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1136.65 MW
Meaford Energy Centre, Meaford Business Park, Meaford Road, Meaford, Staffordshire, ST15 8UZ (4 components)

Gas Fired Generating Station

Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) Meaford Energy Limited New Build Generating CMU Meaford Generating Station Meaford Generating Station +2 more ST15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1127.15 MW
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Blackburn Mill Blackburn Mill BB2
Inactive • 2022-23 (T-4), 2021-22 (T-4)
108.00 MW
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (3 components)

NEW BUILD GAS GENERATION STATION

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
11.40 MW
Knottingley Power Limited, Knottingley CCGT Power Station, Common Lane, Knottingley, West Yorkshire, WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-4)
2979.00 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP1 7DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
1623.37 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Combined Cycle Gas Turbine (CCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) VPI POWER LIMITED New Build Generating CMU Damhead Creek 2 CCGT Damhead Creek 2 OCGT +1 more ME3
Inactive • 2021-22 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
OCGT Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5410.60 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Combined Cycle Gas Turbine (CCGT) EP UK POWER DEVELOPMENT LTD New Build Generating CMU King's Lynn B King's Lynn B +4 more PE34
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6895.24 MW
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (4 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
1422.73 MW
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (2 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Combined Cycle Gas Turbine (CCGT) KEADBY GENERATION LIMITED New Build Generating CMU Keadby 2 Keadby 2 DN17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
1504.80 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1260.00 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (5 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Combined Cycle Gas Turbine (CCGT) EP UK Power Development II Ltd Existing Generating CMU South Humber Bank DN41
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1260.00 MW
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Combined Cycle Gas Turbine (CCGT) Powersite DL Ltd New Build Generating CMU Powersite DL Ltd Powersite DL Ltd +3 more Conditional DE15
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1755.00 MW
Corringham, Stanford-le-Hope, Essex, SS17 9LP, UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Inactive • 2021-22 (T-4), 2020-21 (T-4)
2190.60 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (11 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1172.84 MW