Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

37 unique locations (202 components) - Page 1 of 2

19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)
• Existing OCGT module
• The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity of 4000 kVA.
Inactive • 2023-24 (T-4)
Abergelli Power Station, Felindre, Swansea, SA5 7NN (4 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
• N/A
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BAYSTON HILL QUARRY, BAYSTON HILL, SHREWSBURY, SHROPSHIRE, SY3 0AW (6 components)
• A reciprocating gas engine CHP providing hot water to a local heating network
• Gas fuelled generation plant
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (17 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
156.77 MW
Clayhill Farm, Greenfield Rd, Westoning, Bedfoird, MK54 5JD (near MK45 5AD) (2 components)
• 44MW Storage consisting of 11 x 4MW units
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
Inactive • 2022-23 (T-3), 2020-21 (T-4)
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (9 components)
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.31 MW
Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (4 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• Gas fuelled generation plant
Inactive • 2023-24 (T-4), 2023-24 (T-1)
27.90 MW
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (3 components)
• DSR Component providing load turn down at a data centre
• OCGT from Grain U4. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from landfill gas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The three components of the CMU (referenced VIR074, VIR079 and VIR080) are Cummins QSV91 units, built in 2008 and rated at 1,750kW. Each engine generates at 415V, which is then stepped up to 11kV and then to 33kV for export.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land adjacent to Brynfyrd, Botley Road, Romsey, SO52 9DP (3 components)

10 x 2MW gas powered generator units to be installed on designated land within a manufacturing compound at the Botley Farm.

Inactive • 2021-22 (T-1)
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Fawley , Northern Access Road, Southampton, SO45 1BD  (7 components)
• CMU Component is 500kVA reciprocating diesel engine.
• Gas Turbine CHP GT001B
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (5 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• NEW BUILD GAS GENERATION STATION
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land at Strasbourg St, Westwood Industrial Estate, Margate, Kent, CT9 4JF (13 components)
• 20.7MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off B1165 Spalding PE12 8PT (1 component)

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G under the BSC.

Inactive • 2022-23 (T-4)
Land off Bicester Road Bicester Oxfordshire OX26 6EP (2 components)
• Gas fuelled generation plant
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land off Well Street, Paisley, PA1 2QH (2 components)

4 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND ON THE NORTH SIDE OF GALLEY HILL ROAD NORTHFLEET GRAVESEND DA11 9SW (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Existing OCGT
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
9.63 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Land West of Yelland Quay, West Yelland, Yelland, Barnstaple, EX31 3HB (2 components)
• 10 x 2MW gas reciprocating engines used for power generation, with associated infrastructure.
• Diesel and/or gas reciprocating engines.
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Lynchford Lane, Farnborough, GU14 6LW (1 component)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2023-24 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 25 locations