Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

45 unique locations (144 components) - Page 2 of 2

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Combined Cycle Gas Turbine (CCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) VPI POWER LIMITED New Build Generating CMU Damhead Creek 2 CCGT Damhead Creek 2 OCGT +1 more ME3
Inactive • 2021-22 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
• New build Combined Cycle Gas Turbine plant (2)
• Combined Cycle Gas Turbine plant
OCGT Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED New Build Generating CMU Damhead Creek Damhead Creek +4 more ME3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Damhead Creek ME3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (2 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station (2)

Combined Cycle Gas Turbine (CCGT) RWE KL Limited New Build Generating CMU Kings Lynn A Kings Lynn A PE34
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (4 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (2 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Combined Cycle Gas Turbine (CCGT) KEADBY GENERATION LIMITED New Build Generating CMU Keadby 2 Keadby 2 DN17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Drax Power Station, Selby, YO8 8PH (1 component)

New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

Combined Cycle Gas Turbine (CCGT) DRAX POWER LIMITED New Build Generating CMU Drax CCGT YO8
Inactive • 2023-24 (T-4)
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (2 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Combined Cycle Gas Turbine (CCGT) DEESIDE POWER (UK) LIMITED Existing Generating CMU Deeside Deeside CCGT CH5
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (3 components)
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate
• Cowes 2 - OCGT, fuel is gas-oil
Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_COWE1 CMU_COWE2 +1 more PO32
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land … (2)

Combined Cycle Gas Turbine (CCGT) GATEWAY ENERGY CENTRE LIMITED New Build Generating CMU Gateway Energy Centre Gateway Energy Centre SS17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (6 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 1 converted to open cycle operation please see letter uploaded in metering section that explains determination of three highest HH periods
• Killingholme Module 2 converted to open cycle operation
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas) UNIPER GLOBAL COMMODITIES SE Existing Generating CMU Killingholme Module 1 Killingholme Module 1 (GCA) +4 more DN40
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (8 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (6 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

OCGT Combined Cycle Gas Turbine (CCGT) CENTRICA BARRY LIMITED Existing Generating CMU Barry Barry +1 more CF64
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (4 components)

The CMU component is a combined cycle gas turbine (2)

Combined Cycle Gas Turbine (CCGT) CARRINGTON POWER LIMITED Existing Generating CMU Carrington_1 Carrington_1 +2 more M31
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Basin Road South. Portslade. East Sussex. BN41 1WF (4 components)

Combined Cycle Gas Turbine plant (3)

OCGT Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Shoreham Shoreham +1 more BN41
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (10 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility. (2)
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
ASHLAND FARM BECK LANE SKEGBY SUTTON IN ASHFIELD NG19 6PG (3 components)

NEW BUILD GAS FUELLED GENERATING STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Ashland Farm Beck Lane Skegby Sutton in Ashfield NG19 6PG (2 components)

New Build gas fuelled generation station. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (10 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 8 Coal fired
• Aberthaw 8 OCGT fuel is distillate
Coal Open Cycle Gas Turbine (OCGT) RWE GENERATION UK PLC Existing Generating CMU CMU_ABTH_7C CMU_ABTH_8C +2 more CF62
Inactive • 2021-22 (T-1), 2017-18 (T-1)
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (2 components)

Combined Cycle Gas Turbine (2)

Combined Cycle Gas Turbine (CCGT) VPI POWER LIMITED Existing Generating CMU Rye House Rye House EN11
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Loading map...
Showing 20 locations