Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (43 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
119.61 MW
Whitewalls Road, Rochester, Kent, ME2 4DZ (2 components)

A series of gas generators on an existing site.

Active • 2025-26 (T-1)
37.40 MW
Whitewall Road, Rochester, Kent, ME2 4DZ (4 components)

A series of gas generators on an existing site.

Active • 2026-27 (T-4), 2024-25 (T-1) ...
38.07 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (16 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
West Marsh Road Spalding Lincolnshire PE11 3BB (3 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxiliary load.
• A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Active • 2024-25 (T-4), 2022-23 (T-4) ...
153.14 MW
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
• A new 299MW Open Cycle Gas Turbine peaking plant
• A new Open Cycle Gas Turbine peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Ty Coch Farm Greenfield Holywell CH87HT (8 components)

Gas fuelled generation plant

Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Active • 2024-25 (T-4), 2023-24 (T-4) ...
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
15.54 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (2 components)
• New build open cycle gas turbine
• New build open cycle gas turbine generating plant
Active • 2025-26 (T-4), 2024-25 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (6 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
89.24 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (7 components)

Gas turbine generator

Active • 2024-25 (T-1), 2023-24 (T-1) ...
23.27 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator

Active • 2025-26 (T-4), 2023-24 (T-1) ...
23.27 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (92 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9818.67 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (70 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15432.47 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (4 components)

Existing OCGT plant.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
690.18 MW
Newton Aycliffe CO Durham DL5 6EA (17 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.78 MW
Newton Aycliffe CO Durham DL5 6EA (6 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2023-24 (T-1) ...
3.19 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)

New Gas fulled generation station

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (41 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3569.16 MW