2 unique locations (6 components)

Active MW: 480.45 MW
Inactive MW: 71.13 MW
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (3 components)
• The CMU is an onshore windfarm connected to the distribution system at the Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.58 MW
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (3 components)
• The CMU is an onshore windfarm connected to the distribution system at the Drumcross substation
• The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
• West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
Onshore Wind WEST BENHAR WINDFARM PARTNERSHIP LLP New Build Generating CMU West Benhar West Benhar Windfarm +1 more ML7
Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.58 MW