Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Onshore Wind

4 unique locations (265 components)

PA7 (43 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
85.70 MW
Kirk Hill Wind Farm Kirk Hill nr Kirkoswald South Ayrshire Scotland KA26 9SP (3 components)

This CMU (KHWF01) will be formed of multiple wind turbine generator units controlled centrally & exporting to the Distribution system.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
DE73 (113 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
154.27 MW
BN3 (106 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
234.55 MW
Loading map...
Showing 4 locations