Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Onshore Wind

9 unique locations (390 components)

NG16 (121 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
220.47 MW
NEWTON CLOSE ASHBY-DE-LA-ZOUCH LEICESTERSHIRE LE65 (2 components)
• Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.
• FCC Buckinghamshire Ltd Calvert Landfill Site Brackley Lane Calvert Buckinghamshire MK18 2HF. In build Energy from Waste Plant. Auxiliary load is not included in the connection capacity i.e the export is net. The Meter is an ABB Vision Meter Serial No. K15D00781 Class .5 COP 2 Main and Check MPAN 1170000549278 which are on the list ‘http://www.bis.gov.uk/assets/nmo/docs/utilities/schedule-4-17-december-2010.pdf’
Active • 2028-29 (T-4), 2018-19 (T-4)
29.26 MW
NE12 (58 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
78.18 MW
KENNETH CROSS WAY LON KENNETH CROSS SEALAND CH5 (1 component)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.

Active • 2025-26 (T-1)
6.30 MW
JANAWAY ROAD BLYTH NE24 (1 component)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.

Active • 2028-29 (T-4)
5.43 MW
BH23 (100 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
324.73 MW
BALMORAL PLACE THORNTON-CLEVELEYS LANCASHIRE FY5 (2 components)
• Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.
• T_FFES-3 + 0.25 x T_FFESST1
Active • 2025-26 (T-1), 2018-19 (T-4)
93.94 MW
AL1 (92 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
273.15 MW
Aikengall IIa Wind Farm Innerwick EH42 1SG (13 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
81.44 MW
Loading map...
Showing 9 locations