{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

21 unique locations (78 components)

Active MW: 75316.61 MW
Inactive MW: 965.40 MW
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (4 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1734.13 MW
West Marsh Road Spalding Lincolnshire PE11 2BB (3 components)
• A new combined cycle power station comprising gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
• A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is Net of auxillary load.
Combined Cycle Gas Turbine (CCGT) SPALDING ENERGY EXPANSION LIMITED Spalding Energy Expansion Spalding Energy Expansion +1 more PE11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Thorpe Marsh Power Station, nr Barnby Dun, Doncaster DN3 1ET (4 components)
• CCGT Unit
• CCGT Unit 1 (connected as G1)
• New combined cycle gas turbine power station comprising two units of the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed nr Barnby Dun
Combined Cycle Gas Turbine (CCGT) Thorpe Marsh Power Limited Thorpe Marsh CCGT Thorpe Marsh CCGT +1 more Conditional DN3
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Severn Power Station West Nash Road Newport NP18 2BZ (6 components)

Existing CCGT unit (3)

CCGT Combined Cycle Gas Turbine (CCGT) SEVERN POWER LIMITED Severn Power Unit 10 Severn Power Unit 10 +2 more NP18
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (1 component)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (3 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Redditch Generation Station Windsor Road Redditch B97 6HE (3 components)

Gas turbine generator (3)

Active • 2025-26 (T-4), 2021-22 (T-4) ...
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
LAND AT FENTON LANE LITTLE FENTON SHERBURN IN ELMET LS25 6HA (3 components)

NEW BUILD GAS GENERATION STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit (2)
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Combined Cycle Gas Turbine (CCGT) Knottingley Power Limited Knottingley Unit 1 Knottingley Unit 1 +2 more WF11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Keadby Power Station, Trentside, Scunthorpe, North Lincolnshire, DN17 3EF (4 components)
• Keadby 1 CCGT
• Keadby GT3
• Keadby Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (2 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land … (2)

Combined Cycle Gas Turbine (CCGT) GATEWAY ENERGY CENTRE LIMITED Gateway Energy Centre Gateway Energy Centre SS17
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (6 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Basin Road South. Portslade. East Sussex. BN41 1WF (4 components)

Combined Cycle Gas Turbine plant (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (10 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility. (2)
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
ASHLAND FARM BECK LANE SKEGBY SUTTON IN ASHFIELD NG19 6PG (3 components)

NEW BUILD GAS FUELLED GENERATING STATION (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (2 components)

Combined Cycle Gas Turbine (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)