Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

17 unique locations (325 components)

Active MW: 17191.57 MW
Inactive MW: 3505.09 MW
Victory Road, Derby, Derbyshire, DE24 9HX (8 components) Geocoding Needed
β€’ Existing OCGT.
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Derby Cogen Ltd Derby Cogen Ltd +5 more DE24
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
352.98 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (12 components) Geocoding Needed
β€’ New build gas generator
β€’ Operational reciprocating gas engines
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
30.35 MW
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components) Geocoding Needed
β€’ Battery Storage Facility
β€’ Energy facility comprising of reciprocating engine sets and ancillary equipment.
β€’ Energy facility comprising of reciprocating engine sets.
Storage Reciprocating engines OCGT and Reciprocating Engines STOR 126 LTD New Build Generating CMU Birshaw Birshaw +3 more OL2
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
Longridge Road, Preston, Lancashire PR2 5NQ (6 components) Geocoding Needed
β€’ Battery Storage Facility
β€’ Energy facility comprising of reciprocating engine sets and ancillary equipment.
β€’ Energy facility comprising of reciprocating engine sets.
Storage Reciprocating engines OCGT and Reciprocating Engines STOR 101 LTD New Build Generating CMU Longridge Longridge +3 more PR2
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (5 components) Geocoding Needed

Gas peaking reciprocating engine

Reciprocating engines OCGT and Reciprocating Engines Ravensworth Power Limited New Build Generating CMU Ravensworth Power 021 Ravensworth Power 040 +1 more DH3
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
142.50 MW
Little Barford Power Station, Little Barford, St Neots, PE19 6YT (22 components) Geocoding Needed
β€’ Little Barford 1 CCGT
β€’ Little Barford 1 CCGT MSID: 4052
β€’ Little Barford 1 OCGT . fuel type is distillate MSID: 4052
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
6950.00 MW
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (13 components) Geocoding Needed
β€’ Gas engine system capable of exporting electricity.
β€’ Multiple gas engines capable of exporting electricity.
Reciprocating engines OCGT and Reciprocating Engines SCUNTHORPE FLEXI LIMITED New Build Generating CMU Scunthorpe Gas Scunthorpe Gas A +8 more Conditional DN16
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
190.12 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components) Geocoding Needed
β€’ Battery Storage Plant
β€’ Battery storage plant
β€’ Gas Peaking Reciprocating Engine
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
191.99 MW
Fort Parkway, Heartlands, Birmingham, B24 9QT (22 components) Geocoding Needed
β€’ Existing OCGT
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Reciprocating engines Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Heartlands Power Heartlands Power +4 more B24
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
909.77 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (52 components) Geocoding Needed
β€’ GT5
β€’ GT8
β€’ Unit 4
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
Didcot OCGT Power Station, Didcot, Oxfordshire, OX11 7HA (44 components) Geocoding Needed
β€’ Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
β€’ Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
β€’ Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
947.80 MW
Cowes Power Station, Kingston Road, East Cowes, Isle of Wight, PO32 6JS (23 components) Geocoding Needed
β€’ Cowes 1 - OCGT, fuel is distillate
β€’ Cowes 1 - OCGT, fuel is distillate MSID: 4548
β€’ Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1285.79 MW
Baglan Bay Power Station, Baglan Energy Park, Port Talbot, SA12 7GE (18 components) Geocoding Needed
β€’ Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
β€’ Existing CCGT Baglan Unit 1
β€’ Existing OCGT module
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
577.12 MW
Aspatria Business Park, Park Road, Aspatria, Cumbria, CA7 3DP (2 components) Geocoding Needed
β€’ A gas fuelled electrical power generating unit comprising multiple reciprocating engines
β€’ New build power station comprised of multiple reciprocating engines
Reciprocating engines OCGT and Reciprocating Engines SWB Power Ltd New Build Generating CMU Aspatria BP Not Prequalified CA7
Active β€’ 2024-25 (T-4), 2021-22 (T-4)
4.85 MW
Adjacent to Seal Sand Bulk Storage Facility, Seal Sands, Stockton-on-Tees, Cleveland, TS2 1UB (11 components) Geocoding Needed
β€’ Existing OCGT
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
β€’ The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
439.71 MW
Aberthaw Power Station, The Leys, Aberthaw, Barry, Mid Glamorgan, CF62 4ZW (48 components) Geocoding Needed
β€’ Aberthaw 7 Coal fired unit
β€’ Aberthaw 8 OCGT fuel is distillate
β€’ Aberthaw 9 Coal fired unit
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
4925.44 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (26 components) Geocoding Needed
β€’ New build gas generator
β€’ Operational Reciprocating Engine
β€’ Operational gas reciprocating engine.
Reciprocating engines OCGT and Reciprocating Engines GREENSPAN NIFTY FIFTY LIMITED Existing Generating CMU Wardpark Alpha Wardpark Alpha +14 more G67
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
60.69 MW
Loading map...
Showing 17 locations