Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines

24 unique locations (257 components)

Active MW: 17191.57 MW
Inactive MW: 3505.09 MW
Wytch Farm, Wareham BH20 5JR (4 components) Geocoding Needed

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
10.86 MW
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (7 components) Geocoding Needed
β€’ Gas reciprocating engines
β€’ Reciprocating engines
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
12.27 MW
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components) Geocoding Needed
β€’ Gas engines in a peaking plant environment
β€’ New gas engines in a peaking plant environment, servicing power generation and DSR.
Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX52 FLEX52 Conditional LS10
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
94.03 MW
The Power House, 38 Haughton Road, Darlington, DL1 1ST (18 components) Geocoding Needed
β€’ 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
β€’ 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
54.61 MW
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (4 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
45.59 MW
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components) Geocoding Needed
β€’ Battery Storage Facility
β€’ Energy facility comprising of reciprocating engine sets and ancillary equipment.
β€’ Energy facility comprising of reciprocating engine sets.
Storage Reciprocating engines OCGT and Reciprocating Engines STOR 126 LTD New Build Generating CMU Birshaw Birshaw +3 more OL2
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
Longridge Road, Preston, Lancashire PR2 5NQ (6 components) Geocoding Needed
β€’ Battery Storage Facility
β€’ Energy facility comprising of reciprocating engine sets and ancillary equipment.
β€’ Energy facility comprising of reciprocating engine sets.
Storage Reciprocating engines OCGT and Reciprocating Engines STOR 101 LTD New Build Generating CMU Longridge Longridge +3 more PR2
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
81.80 MW
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (5 components) Geocoding Needed

Gas peaking reciprocating engine

Reciprocating engines OCGT and Reciprocating Engines Ravensworth Power Limited New Build Generating CMU Ravensworth Power 021 Ravensworth Power 040 +1 more DH3
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
142.50 MW
Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (13 components) Geocoding Needed
β€’ Gas engine system capable of exporting electricity.
β€’ Multiple gas engines capable of exporting electricity.
Reciprocating engines OCGT and Reciprocating Engines SCUNTHORPE FLEXI LIMITED New Build Generating CMU Scunthorpe Gas Scunthorpe Gas A +8 more Conditional DN16
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
190.12 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components) Geocoding Needed
β€’ Battery Storage Plant
β€’ Battery storage plant
β€’ Gas Peaking Reciprocating Engine
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
191.99 MW
GREENMOOR BANK FARM, OLD HUTTON, KENDAL, LA8 0NT (3 components) Geocoding Needed
β€’ Battery Storage Plant
β€’ Gas peaking reciprocating engine
β€’ Gas peaking reciprocating engines
Storage Reciprocating engines OCGT and Reciprocating Engines Greenmoor Storage Limited New Build Generating CMU Greenmoor Power 013 Greenmoor Power Limited 038 +1 more Conditional LA8
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
103.90 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (52 components) Geocoding Needed
β€’ GT5
β€’ GT8
β€’ Unit 4
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
Factory Lane, Croydon, Surrey, CR0 3LE (4 components) Geocoding Needed

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Reciprocating engines OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Croydon Energy Croydon Energy +1 more CR0
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
189.45 MW
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components) Geocoding Needed

The CMU is a new reciprocating engine based gas fuelled generating unit.

Reciprocating engines OCGT and Reciprocating Engines Sainc Energy Limited New Build Generating CMU DPG-GAS DPG-GAS Rejected KY1
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
37.23 MW
Cadeby 1, CMM Generation, Garden Lane, Cadeby, Doncaster, DN5 7SN (5 components) Geocoding Needed
β€’ 1x 2.00MW Containerised Generating sets.
β€’ Gas fired generating sets.
β€’ Gas generating unit(s)
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
39.38 MW
Bristol Avenue, Moor Park, Blackpool, FY2 0LZ (8 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
19.00 MW
Bradford Road, Batley, Kirklees, WF17 6JS (18 components) Geocoding Needed
β€’ 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
β€’ 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
56.99 MW
Belvedere Nurseries, Belvedere Lane, Watling Street, Fenny Stratford, Milton Keynes, MK17 9JH (3 components) Geocoding Needed

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
11.40 MW
Baglan Bay Power Station, Baglan Energy Park, Port Talbot, SA12 7GE (18 components) Geocoding Needed
β€’ Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
β€’ Existing CCGT Baglan Unit 1
β€’ Existing OCGT module
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
577.12 MW
Aberthaw Power Station, The Leys, Aberthaw, Barry, Mid Glamorgan, CF62 4ZW (48 components) Geocoding Needed
β€’ Aberthaw 7 Coal fired unit
β€’ Aberthaw 8 OCGT fuel is distillate
β€’ Aberthaw 9 Coal fired unit
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
4925.44 MW
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (2 components) Geocoding Needed

Gas generation peaking plant comprising of 9 x 2MW engines

Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX51 FLEX51 Conditional YO19
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
33.24 MW
25 Southfield, Lingard Lane, Stockport, SK6 2QN (16 components) Geocoding Needed

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
37.99 MW
Loading map...
Showing 24 locations