OCGT and Reciprocating Engines (Fuel Type - Gas)

45 unique locations (1139 components) - Page 1 of 2

WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (12 components)
β€’ A gas turbine installed at Aberdeen Royal Infirmary
β€’ Existing Generation on existing site - CHP
β€’ N/A
Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
63.45 MW
Weir Minerals, Halifax Rd, Todmorden OL14 5RT, United Kingdom (21 components)
β€’ A gas fuelled generating station.
β€’ Existing CCGT
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8.16 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
β€’ A gas engine CHP site providing hot water to a local district heating network
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
β€’ One CHP engine in a horticultural environment with no auxilliary load.
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)
β€’ A generating station consisting on multiple reciprocating engines and alternators located on a single site
β€’ Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
β€’ Standby generation
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY (4 components)
β€’ 247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.
β€’ Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2027-28 (T-4), 2022-23 (T-3) ...
28.51 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
β€’ 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ EV charging at residential premises
β€’ Generating Unit 2
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
52.05 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (27 components)
β€’ Generating Unit 1
β€’ ROCable hydro units within the BMU are not included in the CMU.
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
49.17 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (8 components)
β€’ 3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.
β€’ A 8MW New Build gas fuelled generating station.
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
5.64 MW
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN. (7 components)
β€’ A New Build 5MW Gas Fuelled Generating Station.
β€’ A New Build 8MW Gas Fuelled Generating Station.
β€’ Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
Active β€’ 2027-28 (T-4), 2021-22 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
β€’ Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
β€’ Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (23 components)
β€’ Callington - Existing Site CHP unit
β€’ Gas fired reciprocating engines.
β€’ Nantwich Existing Site CHP
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
34.42 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (4 components)
β€’ 4 x 2MW OCGT gas reciprocating engines
β€’ 49.999 MW pumped storage facility in Gwynedd, North Wales.
β€’ 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active β€’ 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Rhymney, STOR Gen Room, Unit 48, Portmanmoor Road Industrial Estate, Rover Way, Cardiff, CF24 5HB (2 components)
β€’ Gas reciprocating engines as the generating unit.
β€’ New Build 20MW Gas fired facility, metered on the distribution network boundary using a COP2 meter with no auxilliary load on site
Active β€’ 2027-28 (T-4), 2021-22 (T-4)
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
β€’ 1 x hydro turbine & synchronous generator
β€’ 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
β€’ one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
207.87 MW
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
β€’ Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
β€’ OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
β€’ OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2886.91 MW
Poole Bank Nurseries , Common Lane, Welton, Hull, HU15 1UT (18 components)
β€’ Aggregate CMU from multiple sources
β€’ BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
β€’ The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active β€’ 2027-28 (T-4), 2024-25 (T-4) ...
287.90 MW
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (18 components)
β€’ Load reduction on site supported by non-exporting standby generation.
β€’ The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 MW.
β€’ West Burton A Power Station Combined CMU WAC-21 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-3 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (20 components)
β€’ 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
β€’ 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
β€’ Ratcliffe Unit 3 coal-fired unit
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
61.51 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (8 components)
β€’ A 20MW New Build gas fuelled generating station.
β€’ Existing OCGT.
β€’ The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
128.10 MW
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (31 components)
β€’ Battery energy storage unit
β€’ CHP at a horticultural environment.
β€’ Gas CHP engines in commercial horticultural environment with no auxilliary load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
33.86 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
β€’ A completed power plant, with associated civil works, switchgear and electrical connection.
β€’ Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
β€’ Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active β€’ 2027-28 (T-4), 2025-26 (T-4) ...
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
β€’ Gas reciprocating engines
β€’ Generating Unit 2
β€’ The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
22.75 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (13 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
21.23 MW
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (35 components)
β€’ A Battery Energy Storage System.
β€’ Combined Heat and Power Plant Olympic Park London
β€’ Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
14.68 MW
Loading map...
Showing 25 locations