Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCGT and Reciprocating Engines (Fuel Type - Gas)

19 unique locations (440 components)

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (39 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.06 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Newton Aycliffe CO Durham DL5 6EA (24 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.91 MW
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (16 components)
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
• Gas reciprocating engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
59.49 MW
Land lying to the north west of Staithes Road, Hull, HU12 8DX (10 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
38.89 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.09 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Active • 2028-29 (T-4), 2027-28 (T-4) ...
21.23 MW
Grimsby Power Station Moody Lane Grimsby DN31 2SW (15 components)
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
152.20 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (36 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2096.76 MW
Cavendish Rd Stevenage SG1 2ET UK (23 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.64 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (44 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.70 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (23 components)
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
7.71 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (14 components)
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
9.84 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.90 MW
4 Finway Road Hemel Hempstead HP2 7PT (21 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (22 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.23 MW
Loading map...
Showing 19 locations