Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (19 components)
• A gas engine CHP site providing hot water to a local district heating network
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• One CHP engine in a horticultural environment with no auxilliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
8.14 MW
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
443.26 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (23 components)
• Callington - Existing Site CHP unit
• Gas fired reciprocating engines.
• Nantwich Existing Site CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
34.42 MW
Saltend Lane, HULL, HU12 8PP (33 components)
• Load reduction
• Load reduction on site
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (13 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• New Battery Storage Site comprising brand new batteries & inverters
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
10.68 MW
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (8 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Nantwich Existing Site CHP
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Glyn Rhonwy Pumped Storage Facility, Ffordd Clegir, Caernarfon, Gwynedd LL55 4EL Note: The site is currently brown field with no ability to receive post. As such this address uses the nearest current postcode. (13 components)
• 49.999 MW pumped storage facility in Gwynedd, North Wales.
• A new Build Generating Storage CMU
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
284.81 MW
Fowler Welch - Site 2, W Marsh Rd, Spalding PE11 2HR, UK (22 components)
• Gas turbine generator
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
23.54 MW
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (125 components)
• Aux. load separately metered
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• GT8
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31264.81 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2472.54 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
179.28 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (29 components)
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• New build transmission connected battery storage site
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.